Att 3 - SDAP compliance
Attached to the e-mail Retail Bus Type 2 Shop & Salon, Multiple Housing Type 4 Conventional (2 units) & Boundary Realignment (3 lots into 3) - MCU18/0158 & RAL18/0017.
Performance outcomes Acceptable outcomes Response
PO11 Filling and excavation does not cause AO11.1 Compaction of fill is carried out in Complies with AO – No substantial
wind-blown dust nuisance in a state-controlled accordance with the requirements of AS 1289.0 earthworks required.
road. 2000 – Methods of testing soils for engineering
purposes.
AND
AO11.2 Dust suppression measures are used Complies with AO – No substantial
during filling and excavation activities such as earthworks required.
wind breaks or barriers and dampening of
ground surfaces.
Stormwater and drainage
PO12 Development does not result in an No acceptable outcome is prescribed. Complies with AO - Access arrangements
actionable nuisance, or worsening of, improved to State road with associated
stormwater, flooding or drainage impacts in a stormwater improved with new curb and
state-controlled road. channelling to local roads.
PO13 Run-off from the development site is not AO13.1 Development does not create any new Complies with AO - Access arrangements
unlawfully discharged to a state-controlled road. points of discharge to a state-controlled road. improved to State road with associated
AND stormwater improved with new curb and
channelling to local roads.
AO13.2 Stormwater run-off is discharged to a Complies with AO - Access arrangements
lawful point of discharge. improved to State road with associated
stormwater improved with new curb and
Note: Section 3.4 of the Queensland Urban Drainage channelling to local roads.
Manual, Department of Energy and Water Supply,
2013, provides further information on lawful points of
discharge.
AND
AO13.3 Development does not worsen the Complies with AO - Access arrangements
condition of an existing lawful point of discharge improved to State road with associated
to the state-controlled road. stormwater improved with new curb and
channelling to local roads.
PO14 Run-off from the development site during AO14.1 Run-off from the development site Complies with AO - Access arrangements
construction does not cause siltation of during construction is not discharged to improved to State road with associated
stormwater infrastructure affecting a state- stormwater infrastructure for a state-controlled stormwater improved with new curb and
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment Page 4 of 19