Att 3 - SDAP compliance
Attached to the e-mail Retail Bus Type 2 Shop & Salon, Multiple Housing Type 4 Conventional (2 units) & Boundary Realignment (3 lots into 3) - MCU18/0158 & RAL18/0017.
Performance outcomes Acceptable outcomes Response
movement or vibration impacts that would cause
damage or nuisance to a state-controlled road,
road transport infrastructure or road works.
Note: To demonstrate compliance with this
performance outcome, it is recommended an RPEQ
certified geotechnical assessment, prepared in
accordance with Volume 3 of the Road Planning And
Design Manual 2nd edition, Department of Transport
and Main Roads, 2016, is provided.
PO8 Development involving the haulage of fill, AO8.1 Fill, extracted material and spoil material Complies with AO – No substantial
extracted material or excavated spoil material is not transported to or from the development earthworks required.
exceeding 10,000 tonnes per year does not site on a state-controlled road.
damage the pavement of a state-controlled road.
Note: It is recommended a pavement impact
assessment is provided in accordance with the Guide
to Traffic Impact Assessment, Department of
Transport and Main Roads, 2017.
PO9 Filling and excavation associated with the No acceptable outcome is prescribed. Complies with AO - Access arrangements
construction of vehicular access to a improved to State road.
development does not compromise the operation
or capacity of existing drainage infrastructure for
a state-controlled road.
PO10 Fill material used on a development site AO10.1 Fill material is free of contaminants Complies with AO – No substantial
does not result in contamination of a state- including acid sulfate content. earthworks required.
controlled road.
Note: Soils and rocks should be tested in accordance
with AS 1289.0 – Methods of testing soils for
engineering purposes and AS 4133.0-2005 –
Methods of testing rocks for engineering purposes.
AND
AO10.2 Compaction of fill is carried out in Complies with AO – No substantial
accordance with the requirements of AS 1289.0 earthworks required.
2000 – Methods of testing soils for engineering
purposes.
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment Page 3 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.