Performance outcomes Acceptable outcomes Response
Water catchment
Requirements relating to water extension to an existing dwelling
quality, stormwater management house to allow the existing 82.4
and effluent disposal are SQM two-bedroom dwelling to be
used as a secondary dwelling.
contained in the Water Quality and
Drainage Code in Part 9. The proposed development will be
connected to the existing 10 EP
Requirements relating to Advanced secondary effluent HSTP
excavation and filling are and treated waste water will be
contained in the Earthworks pumped to a new surface irrigation
Code in Part 9. area outside the Lake Macdonald
catchment.
Requirements relating to flooding
Surface water and roof drainage is
and environment protection and planned to be discharged to a legal
waterways management are point of discharge via a rubble pit.
contained in the Flood Hazard
Overlay Code and the Biodiversity, No new driveway areas are
Waterways and Wetlands Overlay proposed and driveway drainage is
Code in Part 8. diverted away from the Water
resource catchment and the Water
supply buffer areas.
PO2 AO2.1 AO2.1
Development within a water supply For rural activities the stockpiling NA
buffer does not include the of waste litter, manure and other The proposed development does
not include the stockpiling of waste
incineration or burial of waste and organics is only undertaken as
litter, manure and other organics.
all other waste is collected and follows:
stored in weather proof, sealed
waste receptacles, located in 1. on surfaces constructed with
roofed and bunded areas, for permanent impervious
disposal by a licensed contractor. underlay to minimise leaching;
2. located outside of an effluent
irrigation area;
3. located away from
groundwater and recharge
areas;
4. sized to accommodate the
proposed disposal timeframes;
5. designed with run-off diversion
drainage upstream to prevent
uncontaminated stormwater
movement into the area;
6. bunded to capture
contaminated run-off for
appropriate treatment and
disposal; and
7. covered, desirably within a
shed but otherwise with
weatherproof material.
Editor's note—Groundwater and
recharge areas are shown on the
Queensland
Government Wetland Info
mapping.
AO2.2
The reuse of waste litter, manure
and other organics as soil
conditioners or fertilizers is not
undertaken on-site.
AO2.3
Composting activities are not
undertaken on-site.
DA forms guide: Planning report template | July 2017 Page 45 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.