Skip to the record
For the highest quality transcripts.

Council archive · source document

Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
OZCARE NOOSA AGED CARE RESIDENCE                                                           Construction Management Plan


    Vehicles are parked at the owner’s risk and no responsibility will be accepted for loss or damage to
    vehicles in parking areas or to any goods or things carried in or on the said vehicle whether caused by
    negligence or in any manner whatsoever.

    Trucks and earthmoving equipment in particular, will not be parked on the street and when moving on
    and off site, must be maintained to ensure that noxious weeds are not introduced.




      Figure 1 – Site Entry & Local Parking



    All directions and instructions given by a representative of the Client, in the performance of their duties,
    are to be obeyed. Disciplinary action may be taken against any person who disregards any direction, or
    any instruction given by the representative in the performance of their duty.

    Wearing of seat belts is mandatory.

    Woollam will remain responsible for all persons working on or visiting the site, and through the above
    processes, will ensure that workers only access authorised areas, and will respond to any issues relating
    to behavior of project personnel.

    Contract Partners are to ensure that the wheels, tracks and body of all constructional plant are free of
    weeds, mud or concrete slurry before entering or leaving the site and designated parking areas. Such
    directions will be included in subcontractor scopes of works, issued to all stakeholders and included in all
    on site inductions. This is a mandated access requirement.




Woollam Constructions                                                                                              Page 7 of 17

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.