Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

MCU10/2083 Development Application part 2 - Attachment 5 - Traffic and Transport Assessment Report

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Traffic & Transport Assessment -
Background Situation




                                                                                   ROUTES 626, 627, 630, 631
                                                                                    WALK DISTANCE = 485M
                     SUBJECT SITE
                      LOCATION




                                                                                    Copyright: 2010 Google – Map data



               Figure 2-5          Site Locality – Bus Stop Locations


         Table 2-3           Subject Site – Bus Route Service Frequencies

            Bus Service Provider           Route          Destination       Peak Hour Trips          Off Peak Trips
            Sunshine Coast Sunbus           620           Maroochydore          0 per hour              1 per hour
            Sunshine Coast Sunbus           626          Noosa Junction         2 per hour              2 per hour
            Sunshine Coast Sunbus           627          Sunshine Beach         2 per hour              2 per hour
            Sunshine Coast Sunbus           630          Nambour Station        0 per hour              1 per hour
            Sunshine Coast Sunbus           631          Nambour Station        0 per hour              1 per hour
                     Total                                                      4 per hour              7 per hour


2.6      Pedestrian & Bicycle Facilities
               Pedestrian footpaths are provided on both sides of Gibson Road and the western side of Skipper
               Place. The nearest formal pedestrian crossing of Gibson Road and Skipper Place is located at the
               roundabout intersection located at the north-eastern corner of the subject site.
               On-street bicycle lanes are provided on Gibson Road fronting the subject site.




CTLRNO_r01_v02_FINAL
Log in to download the original file

MCU10_2083 Development Application part 2 - Attachment 5 - Traffic and Transport Assessment Report.pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.