Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
requirements specified in Table 8.2.6.4.
AO9.2
Essential community infrastructure which is located below
the specified flood immunity requirements:
﴾a﴿ is designed and constructed to function effectively
during and immediately after the recommended flood
level event; and
﴾b﴿ has direct access to low hazard evacuation routes or
an emergency rescue area above the PMF if it is for
emergency services (including emergency shelters,
police facilities, hospitals and associated facilities).
Earthworks
PO10 AO10
Excavation and filling for operational works only occur where Filling, other than accessways, does not extend more than
they: 13 metremetres beyond the footprint of anya building,
﴾a﴿ result in the protection, rehabilitation and repair of measured from the outer walls of the building.
ecologically important areas, watercourses, drainage
lines and wetlands;
﴾b﴿ do not adversely impact on the overall hydrology,
hydraulics and flood capacity of a waterway;
﴾c﴿ do not directly, indirectly or cumulatively cause
adverse impacts external to the site;
﴾d﴿ do not cause increased flooding, which adversely
affects the safety or use of any land upstream or
downstream;
﴾e﴿ do not cause ponding of water on the site or nearby
land;
﴾f﴿ do not result in a reduction in flood storage capacity;
﴾g﴿ do not adversely affect the flow of water in any
overland flow path; and
﴾h﴿ do not adversely affect the privacy or visual amenity of
surrounding property.
Editor’s Note— The Earthworks Code sets out further
requirements for earthworks.
Hazardous materials
PO11 AO11.1
Development ensures that public safety and the environment Materials manufactured or stored on site are not hazardous
are not adversely affected by avoiding the release of or noxious, or do not comprise materials that may cause a
hazardous materials into flood waters and the environment. detrimental effect on the environment if discharged in a flood
event.
OR
AO11.2
If a DFE is adopted, structures used for the manufacture or
storage of hazardous material are located above the DFE level.
**FINAL DRAFT Post Consultation 2019** Page 5 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.