Erosion and Sediment control checklist and calcs · OPW19/0098
Attached to the e-mail Operational Works application OPW19/0098 - Cover Letter - DA Form 1 - Site Plan - Erosion & Sediment Control checklist - Acid Sulfate Report - Civil Plans - 64 Gateway Drive Noosaville -.
T jobno: / BSSG O D ee al = by: GA engineers & project managers calculation sheet date 3). 65.18 project ©4 GATEWAY DRIVE, MCOSANILLE subject EROS (OM HAZARD ASSE-SSMEAIT EROS(OM HAZARD TASK NUMECR HeiTiAl) SS) H = HAZARD RATING <TOCO COOK RISK 72OCO HIaH RISE T = DURATIOA! OF DISTURBANCE (monrHS As AREA OF DISTURBANCE (im) S= swore FACTOR (TABLE F2 -1ECA Aust.) K = Soll EROSIVITY FACTOR (RUSLE K FACTOR) Ts G WEEKS D /. SB MwTHs A = B7SO Ph ig S= 0.23 Gore LENGTH BOm, GRADIENT 1-2/) K = 0.088 D9 ASSUMES Medium PLAST) CIT7 CLAY NE: SOIL VAT ESTED H= 1.38 x 8730 *O-23 x 0.058 = IGl < 200 CLASSED AS LOW RISE , Noosa: 0754499600 Sunshine Coast: 0753293190 Mackay; 07 4840 2337 PO Box 61, Noosaville, QLD 4566, Australia www.todconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Erosion and Sediment control checklist and calcs.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.