Council archive · source document
Erosion and Sediment control checklist and calcs · OPW19/0098
Attached to the e-mail Operational Works application OPW19/0098 - Cover Letter - DA Form 1 - Site Plan - Erosion & Sediment Control checklist - Acid Sulfate Report - Civil Plans - 64 Gateway Drive Noosaville -.
T jobno: /(8BSSG OD oe ca = = . bu: GA engineers & project managers calculation sheet date 21s g project! GA GATEWAY DRIVE, NIOOSANILLE subject: RUSLE CALCULATION TOTAL CATCHMENT = 0.8730 ha DISTURBED CATCHMENIT = ©. S730 he ASSUPIEb Soll TEXTURE GROLP = TYPE F R~ RAINFALL EROSINITY (R- FACTOR) K = Soil ERODIBILITY FACTOR. CS = LENGTH GEADIENT FACTOR, C= COVER MANAGEMENT FACTOR. P= CROSIOAA CONTTROU PRACTICE FACTOR A (f ANACAL SOIL LOSS FROM EROSION (E/ha/y-) Az IrRi.jA.| US|). [c | Pp R= 164.74 (1.1177) 5 Stat WHERE S = @ TEAR G HR STORM > IF FoR NOOSAYILLE = /6.G rete her K= 6890 K= 0.0S8 — mediurt PLASTICITY CLAY ASSUMED LS = 0.23 (GLoPe LENGTH 80% cave |-2/-) c= | (wo cover) P= (.3 (comPAcTeD AALD SMOOTH fe ConSTRUCTOY PHASE ) A= GS9Ox 0.0SBx O.7S x! x (-3 =| lz t/ha/ge ESTIMATES soit CoSS pocS NoT ExXcEED [so C/ hed ye (ISCA. APPENDIX & PAGE 8.4) RE COMMERD + CREATION OF BASIA( USING EXCESS SPOIL ~e I~ HIGH BLNB TO NORTHERN BooAMEY WITH WEIR. AT NORTH EAST CORNER . aReST AT IL 4- WS eer. lOn~ UtiBG 4 BOO. pee, Noosa: 07 54499600 Sunshine Coast: 07 53293190 Mackay: 07 4840 2337 PO Box 61, Noosaville, QLD 4566, Australia. www.todconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Erosion and Sediment control checklist and calcs.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.