GENERAL COMMITTEE MEETING MINUTES 15 FEBRUARY 2021
i. a Traffic Management Control Plan in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD) detailing
all temporary signage and traffic control measures prior to
construction
ii. maintenance of safe pedestrian access for the areas affected
by the works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of
the development
iv. approval of the Traffic Management Control Plan by the
Department of Transport and Main Roads (DTMR) for any
works on State controlled roads
v. provision for worker car parking
b) maintenance and protection of water quality and existing drainage
lines through the construction site, through the implementation of
appropriate erosion and sediment control measures;
c) works programme identifying key components of the works and their
respective durations;
d) establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to
advise of agreed construction times, impacts on traffic, services and
other relevant issues;
e) a post out to the local residents and businesses prior to the pre-start
meeting advising of the site contact details and the potential for off-
site impacts during the developments construction. The post out
must:
i. include a copy of the architectural approved plans;
ii. include plans that show any impacts on the road network;
iii. be distributed to all businesses and residences in the area
bounded by:
adjoining property; and
Halse Lodge (Lot 2 RP865533)
Written confirmation of the post out must be submitted to Council a
minimum of 5 days prior to the pre-start meeting.
f) include signage in prominent locations on the boundaries of the site
advising of the proposed development, the expected time frames and
the site contact details;
g) identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
h) details on the location of external fill/dump sites, the haulage route,
type of vehicle to be utilised during operations and frequency of
usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense;
Page 9 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.