Response to RFI Sewer & Water Network Plans · OPW25/0057

of 16

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

   WATER NOTES                                                                                                                               MINIMUM HORIZONTAL CLEARANCE, mm
                                                                                                                                                                                                               MINIMUM VERTICAL1
                                                                                                                       UTILITY                                                                                                         CONSTRUCTION NOTES
   GENERAL NOTES                                                                                                                                               NEW MAIN SIZE NB                                   CLEARANCE
                                                                                                                 (EXISTING SERVICE)                                                                                                    1.    INSTALL PIPEWORK PARALLEL TO PROPERTY BOUNDARIES.
   1.      ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH EAST                                                                                                                                     (mm)
           QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND STANDARDS. (SEQ
                                                                                                                                                  ≤ 200 NB                       > 200 NB                                              2.    MAIN, SERVICE AND METER SHALL BE INSTALLED BY THE
                                                                                                                                                                                                                                             DEVELOPER.
           WAT-1101-3 AND 1102-1)                                                                                 WATER MAINS ≤ 375mm                3003                              600                              150            3.    WRAP FLANGES AND BOLTS WITH A PETROLATUM TAPE SYSTEM IN
   2.      UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH
                                                                                                                  WATER MAINS2 > 375 mm               600                              600                              300                  ACCORDANCE WITH SEQ-WAT-1313.
           THE RELEVANT AUSTRALIAN STANDARDS.                                                                                                                                                                                          4.    DEFLECTION DETAILS I.E. PIPE LENGTH AND OFFSET SHALL BE
                                                                                                                                                       5                                5                                  4
   3.      ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.                                             GRAVITY SEWERS ≤ 300mm            1000 /600                      1000 /600                            500
                                                                                                                                                                                                                                             DETAILED ON DESIGN DRAWING.
   4.      CLEARANCE ON MAINS FROM PERMANENT LEVEL TO BE AS SHOWN IN                                             GRAVITY SEWERS < 300mm                5
                                                                                                                                                   1000 /600                            5
                                                                                                                                                                                  1000 /600                            500 4
           SEQ-WAT-1200.2.
   5.      CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD DRAWINGS.                                           GAS MAINS                    3003                              600                             5004            DI & PVC PIPE
   6.      A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS TO BE INSTALLED AT                            TELECOMMUNICATION CONDUITS                                                                                                 5.    DUCTILE IRON FITTINGS MAY BE USED WITH DI & PVC PIPE.
                                                                                                                                                     3003                              600                              300                  FITTINGS SHALL BE FBE COATED AND LINED. CEMENT LINED WITH A
           THE SERVICE POINT OF EACH LOT IN ACCORDANCE WITH THE STANDARD DRAWING                                   AND CABLES
           FOR THE SEQ-SP.                                                                                                                                                                                                                   BITUMINOUS EXTERNAL COATING MAY BE USED WITH APPROVAL.
                                                                                                                 ELECTRICITY CONDUITS AND
   7.      ALL MATERIALS USED IN THE WORKS SHALL COMPLY WITH THE SEQ-SP's ACCEPTED                                                                    500                              1000                          5004 AND 7              DO NOT USE PVC FITTINGS.
                                                                                                                          CABLES                                                                                                       6.    PE SLEEVING, COLOURED FOR THE PRODUCT IS REQUIRED ON ALL
           PRODUCTS AND MATERIALS LIST OR BE APPROPRIATELY SHOWN, LISTED AND                                                                               3
                                                                                                             STORMWATER DRAINS ≤ 300mm               300                               600                             1504                  DI PIPE AND FITTINGS APPLIED IN ACCORDANCE WITH AS3681. TWO
           DEFINED IN THE ENGINEERING SUBMISSION SO THAT THE ALTERNATIVE PRODUCT
           OR MATERIAL CAN BE ASSESSED AND IF APPROPRIATE, APPROVED BY THE SEQ-SP.                           STORMWATER DRAINS > 300mm               3003                              600                             3004                  THICKNESS REQUIRED BETWEEN FITTINGS AND THRUST BLOCK.
   8.      ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.                                                                                                                                                                                REINSTATE ANY DAMAGED SLEEVING AS PER MANUFACTURER'S
                                                                                                                          KERBS                       150                              6006                    150 (WHERE POSSIBLE)          SPECIFICATIONS.
   9.      TEST/CHLORINATION POINTS TO BE INSTALLED IN ACCORDANCE WITH STANDARD
           DRAWING NO.SEQ-WAT-1410-1.                                                                       ALL SERVICES AS PER SEQ WATER CODE CLAUSE 5.12.5.2.                                                                        7.    USE PRE-TAPPED CONNECTORS ON DN100 TO DN300 NEW MAIN
   10.     THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON THESE                                                                                                                                                                    INSTALLATIONS.
           DRAWINGS MUST BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION.                                                                                                                                                       8.    USE TAPPING BANDS FOR CONNECTIONS TO EXISTING MAINS.
           WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE PERMITTED TO                               CLEARANCE NOTES                                                   UNDER OTHER SERVICES, THE DESIGN SHALL NOMINATE
           CONNECT TO THE RETICULATION SYSTEM.                                                              1. VERTICAL CLEARANCES APPLY WHERE WATER MAINS                    AN    APPROPRIATE     TRENCHLESS    CONSTRUCTION         PVC PIPE                                                                                                   Shane Rynne
                                                                                                                                                                                                                                                                                                                                         I,............................................. of COVEY ASSOCIATES Pty. Ltd.
   11.     ALL WORKS ON EXISTING WATER MAINS TO BE CARRIED OUT BY UNITYWATER                                   CROSS ONE ANOTHER AND OTHER UTILITY SERVICES,                  TECHNIQUE IN ACCORDANCE WITH CLAUSE 5.5 OR               9.    USE PRE-TAPPED CONNECTORS, REFER NOTE 7.
                                                                                                                                                                              OTHER WATER MAIN CONSTRUCTION AND PROTECTION             10.   PVC PIPE SHALL NOTE BE IN CONTACT WITH THRUST BLOCK
           PRIVATE WORKS AT THE DEVELOPER'S EXPENSE.                                                           EXCEPT IN THE CASE OF SEWERS WHERE A VERTICAL
                                                                                                                                                                              TREATMENT (ie SCL MAIN WITH CONCRETE
                                                                                                                                                                                                                                                                                                                                                                 18-03-2025
                                                                                                                                                                                                                                                                                                                                                         ON............................, CERTIFY that:
                                                                                                               SEPARATION SHALL ALWAYS BE MAINTAINED, EVEN                                                                                   CONCRETE.
                                                                                                                                                                              ENCASEMENT), EFFECTIVELY JOINT-FREE IN THE               11.   MAXIMUM SIZE OF DRILLED HOLES FOR SERVICE CONNECTIONS IN
   WATER MAIN NOTES                                                                                            WHEN THE MAIN AND SEWER ARE PARALLEL. THE MAIN
                                                                                                                                                                              VICINITY OF OTHER SERVICES.
                                                                                                                                                                                                                                                                                                                                             1. This design drawing has been assessed in accordance with
   12.     ALL WATER RETICULATION CONSTRUCTION TO BE IN ACCORDANCE WITH CURRENT                                SHOULD ALWAYS BE LOCATED ABOVE THE SEWER TO                                                                                   PVC PIPE TO BE 30% OF DN OR 50 (LOWER VALUE TO BE USED).                                           requirements of the SEQ Code and Unitywater Standards;
           SOUTH EAST QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND                                          MINIMISE    THE    POSSIBILITY   OF     BACKFLOW            5. WHERE A PARALLEL SEWER IS AT THE MINIMUM                 12.   PVC PIPE SHALL NOT BE BENT OR CURVED.                                                           2. The construction of the works must only be undertaken in
           STANDARDS.                                                                                          CONTAMINATION IN THE EVENT OF A MAIN BREAK.                    VERTICAL CLEARANCE LOWER THAN THE WATER MAIN                                                                                                                      accordance with this drawing; and
   13.     PRESSURE AND BACTERIOLOGICAL TESTING SHALL BE UNDERTAKEN ON ALL                                  2. WATER MAINS INCLUDES MAINS SUPPLYING DRINKING                  (500mm), MAINTAIN A MINIMUM HORIZONTAL CLEARANCE         DI PIPE                                                                                               3. No design Amendments are permitted either before or
           WATER MAINS.                                                                                        WATER AND NON-DRINKING WATER.                                  OF 1000mm. THIS MINIMUM HORIZONTAL CLEARANCE CAN         13.   DIRECT TAPPING OF DICL PIPE IS PROHIBITED.                                                         during construction without the approval of Unitywater.
   14.     TESTING OF ALL WATER RETICULATION CONSTRUCTION TO BE IN ACCORDANCE                                                                                                 BE PROGRESSIVELY REDUCED TO 600mm AS THE                 14.   ELECTRICALLY ISOLATE COPPER SERVICES FROM DI PIPE.                                              4. During construction, where required, Variation Notifications
                                                                                                            3. CLEARANCES CAN BE FURTHER REDUCED TO 150mm FOR
           WITH UNITYWATER REQUIREMENTS, AS PER SEQ CODE, SECTION 19 OF WSAA's                                                                                                VERTICAL CLEARANCE IS INCREASED TO 750mm.                                                                                                                         must be submitted in accordance with the A&C Manual.
                                                                                                               DISTANCES UP TO 2m WHERE MAINS ARE TO BE LAID
           WATER SUPPLY CODE OF AUSTRALIA AND ANY SEQ CODE AMENDMENTS.                                         PAST INSTALLATIONS SUCH AS CONCRETE BASES FOR               6. CLEARANCE FROM KERBS SHALL BE MEASURED FROM              PE PIPE
   15.     CONCRETE BULKHEADS TO BE INSTALLED TO ALL WATER MAINS LAID AT GREATER                               POLES, PITS AND SMALL STRUCTURES, PROVIDING THE                THE NEAREST POINT OF THE KERB. FOR WATER MAINS           15.   PE PIPE MAY BE COLD BENT TO A MXIMUM RADIUS AS PER POP202,                                                                                                         ACR/MAJ
           THAN 15% SLOPE. BULKHEADS TO BE CONSTRUCTED IN ACCORDANCE WITH SEQ                                  STRUCTURE WILL NOT BE DESTABILISED IN THE                      ≤DN 375 CLEARANCES FROM KERBS CAN BE                           STAKES OR OTHER SOURCES OF POINT LOADS SHALL NOT BE                                                                                                        2020-112
                                                                                                                                                                                                                                                                                                                                               SIGNED: .........................................................
           CODE STANDARD DRAWINGS SEQ-WAT-1209-1 AND 1210-1.                                                   PROCESS. THE CLEARANCE FROM TIMBER POLES                       PROGRESSIVELY REDUCED UNTIL THE MINIMUM OF                     USED TO ASSIST IN BENDING THE PIPE.
   16.     WATER MAINS ARE TO BE CONSTRUCTED ON OPPOSING SIDES OF THE ROAD TO                                  SHOULD BE AT LEAST 200mm AND PREFERABLY 300mm.                 150mm IS REACHED FOR MAINS ≤DN 200.                      16.   MAKE ALLOWANCE DURING CONSTRUCTION FOR EXPANSION AND
           SEWER UNLESS OTHERWISE NOTED. ALL WATER MAINS ARE TO BE ON A 1.5m                                4. WATER MAINS INCL. WATER SERVICES AND FIRE                   7. AN ADDITIONAL CLEARANCE FROM HIGH VOLTAGE                      CONTRACTION OF PE PIPE DUE TO TEMPERATURE CHANGES.
           ALIGNMENT FROM PROPERTY BOUNDARIES IN ROAD RESERVES.                                                HYDRANT OFFTAKES SHOULD ALWAYS CROSS OVER                      ELECTRICAL INSTALLATIONS SHOULD BE MAINTAINED            17.   ELECTROFUSION AND BUTT WELDING TO BE IN ACCORDANCE WITH
   17.     FIRE HYDRANTS TO BE LOCATED AS INDICATED WITH 80m MAXIMUM BETWEEN                                   SEWERS, STORMWATER GAS AND ELECTRICAL UNLESS                   ABOVE THE CONDUITS OR CABLES TO ALLOW FOR A                    WSA-01 (POLYETHYLENE CODE), BUTT WELDING IN TRENCHES IS
           HYDRANTS.                                                                                           WRITTEN APPROVAL FROM AGENCY. FOR CASES WHERE                  PROTECTIVE BARRIER AND MARKING TO BE PROVIDED.                 NOT PERMITTED.
   18.     ALL Ø250, Ø150 & Ø100 WATER MAINS ARE TO BE CONSTRUCTED WITH PVC-O                                  THERE IS NO ALTERNATIVE AND THE MAIN MUST CROSS                                                                         18.   ALL MECHANICAL COUPLINGS TO BE SELF-RESTRAINING.
           CLASS PN16 PIPES UNO. (CRUSHING STRENGTH OF PIPE TO BE SN10).                                                                                                                                                               19.   REFER SEQ-WAT-1409-1 FOR TYPICAL PE ARRANGEMENTS.
   19.     ALL FLANGES AND GIBAULTS TO BE HOT DIPPED GALV. NUTS, BOLTS AND WASHERS
           SHALL BE S.S. GRADE 316. REFER TO SEQ-WAT-1313-1.                                                                                  MINIMUM PIPE COVER
   20.     ALL WATER SERVICE CONNECTIONS TO BE CONSTRUCTED IN ACCORDANCE WITH
           UNITYWATER AMENDMENT TO WATER SUPPLY CODE OF AUSTRALIA (WSA03-2011                                                                                                    NEW MAIN SIZE NB
           V3.1) AND STANDARD DRAWINGS SEQ-WAT-1108-1, 1108-2 AND 1108-3. ALL WATER                                                 LOCATION                                                                                                                                                                                          UNITYWATER - SCHEDULE OF LIVE WORKS
           SERVICES TO BE P.E.                                                                                                                                           ≤ 200 mm NB              > 200 mm NB                                   ALL ENVIRONMENTAL PROTECTION MEASURES SHOULD
   21.     BEDDING TO BE INSTALLED IN ACCORDANCE WITH UNITYWATER AMENDMENT TO                                                                                                                                                                    BE IMPLEMENTED PRIOR TO THE COMMENCEMENT OF                                                                                                                                TEE/
                                                                                                            NON-TRAFFICABLE AREAS, DRIVEWAYS, VERGES/FOOTPATHS                  600                     1000                                                                                                 ITEM                                 DESCRIPTION                                        DIA. WATER                             VALVES
           WATER SUPPLY CODE OF AUSTRALIA (WSA03-2011 V3.1) AND STANDARD DRAWING                                                                                                                                                                      ANY CLEARING OR CONSTRUCTION WORK                                                                                                                                    BENDS
           SEQ-WAT-1200-2 AND 1201-1. BEDDING TYPE TO BE CONFIRMED ON SITE BY                               CARRIAGEWAY OF SEALED LOCAL ROADS                                   600                     1000
           ENGINEER UPON TRENCH EXCAVATION.                                                                                                                                                                                                                                                                CONNECTION # 1
                                                                                                            CARRIAGEWAY OF UNSEALED ROADS                                       750                     1000
   22.     BEDDING MATERIAL TO BE WASHED 3mm SAND UNLESS NOTED OTHERWISE.                                                                                                                                                                                IT IS THE RESPONSIBILITY OF THE                              CONTRACTOR TO LAY NEW WATER MAIN TO 3m FROM CONNECTION
                                                                                                            CARRIAGEWAYS OF MAJOR ROADS, EMBANKMENTS                            750                     1000                                         CONTRACTOR TO CONTACT THE RELEVANT
   23.     ALL BACKFILL TO BE COMPACTED TO 95% MAXIMUM DRY DENSITY (STANDARD) FOR                                                                                                                                                                                                                                     POINT A OR AS DIRECTED BY UNITYWATER. CONTRACTOR TO
           COHESIVE SOILS AND TO A DENSITY INDEX OF 70% FOR NON-COHESIVE SOILS.                             INDUSTRIAL AND COMMERCIAL AREAS                                     750                     1000                                        AUTHORITIES TO CONFIRM THE LOCATION OF                    1(A)                                                                                       DN180                  -                -
                                                                                                                                                                                                                                                                                                                      PERFORM ALL TESTS REQUIRED, ON COMPLETION NOTIFY
   24.     MINIMUM COVER TO TOP OF WATER MAIN SHALL BE IN ACCORDANCE WITH                                                                                                                                                                              ALL EXISTING SERVICES PRIOR TO THE                             UNITYWATER
                                                                                                            CARRIAGEWAY OF MOTORWAYS/FREEWAYS                                  1200                     1200                                             COMMENCEMENT OF EXCAVATION
           UNITYWATER AMENDMENT TO WATER SUPPLY CODE OF AUSTRALIA (WSA03-2011                                                                                                                                                                                                                                         AFTER SUCCESSFUL ON MAINTENANCE, UNITYWATER IS TO
           V3.1), TABLE 7.2.                                                                                                                                                                                                                                                                                          COMPLETE REMAINDER OF WORK INCLUDING: REMOVAL DUCKFOOT
   25.     ALL THRUST BLOCKS TO BE INSTALLED IN ACCORDANCE WITH UNITYWATER                                                                                                                                                                                                                                    1(B)                                                                                       DN180                 2                 1
           AMENDMENT TO WATER SUPPLY CODE OF AUSTRALIA (WSA03-2011 V3.1) AND
                                                                                                            VEGETATION PROTECTION                                                                                                                                                                                     HYDRANT AND THRUST BLOCK. INSTALLING MAIN AND FITTINGS AS
                                                                                                            A.     TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR TO                                                                     NOTE: CONNECTION TO UNITYWATER                                PER CONNECTION DETAIL
           STANDARD DRAWING SEQ-WAT-1205-1, 1206-1 AND 1207-1. (MUST BE INSTALLED ON
                                                                                                                   CONSTRUCTION, OR REPLACED IF DESTROYED.                                                                                             NETWORK INFRASTRUCTURE IS SUBJECT
           ALL BENDS, TEES AND DEAD ENDS)
                                                                                                            B.     WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES                                                                              TO FURTHER APPLICATION
   26.     VALVES AND HYDRANTS SHALL BE INSTALLED IN ACCORDANCE WITH UNITYWATER
                                                                                                                   SHALL BE CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND
           AMENDMENT TO WATER SUPPLY CODE OF AUSTRALIA (WSA03-2011 V3.1) AND
                                                                                                                   ARRANGED VERTICALLY FROM GROUND LEVEL. GIRDLES SHALL BE STRAPPED                                                                     NOTE: THRUST BLOCKS ARE REQUIRED
           STANDARD DRAWING SEQ-WAT-1301-1 AND 1302-1.
                                                                                                                   TO TREES PRIOR TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.                                                                             AT ALL CHANGES OF DIRECTION
                                                                                                                                                                                                                                                                                                                                     UNITYWATER - SCHEDULE OF PIPEWORK & FITTINGS
   27.     VALVES AND HYDRANTS FOR FUTURE EXTENTION INSTALLATION SHALL BE
                                                                                                            C.     TREE ROOTS SHALL BE TUNNELED UNDER, RATHER THAN SEVERED. IF ROOTS                                                                                                                                                   ITEM            QTY                                DESCRIPTION
           INSTALLED IN ACCORDANCE WITH UNITYWATER AMENDMENT TO WATER SUPPLY
                                                                                                                   ARE SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE                                                                       NOTE: ALL WORKS ON EXISTING WATER
           CODE OF AUSTRALIA (WSA03-2011 V3.1) AND STANDARD DRAWING SEQ-WAT-1303-1.                                                                                                                                                                                                                                                  CONNECTION 1
                                                                                                                   FUNGICIDE. CONTACT RELEVANT COUNCIL ARBORIST FOR FURTHER ADVISE.                                                                        MAINS TO BE CARRIED OUT BY
   28.     VALVE, HYDRANT & WATER MAIN ROAD CROSSING MARKERS TO BE INSTALLED IN
                                                                                                            D.     ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED                                                                       UNITYWATER AT DEVELOPER'S EXPENSE                                                 1              3m         DN180 PE100 PN16 WATER MAIN
           ACCORDANCE WITH UNITYWATER AMENDMENT TO WATER SUPPLY CODE OF
                                                                                                                   ARBORIST.
           AUSTRALIA (WSA03-2011 V3.1) AND STANDARD DRAWING SEQ-WAT-1300-1 AND                                                                                                                                                                                                                                                           2               1         DN250x150 FLANGED OFF-TAKE CLAMP
           1300-2.                                                                                                                                                                                                                                                                                                                       3               1
                                                                                                            SOIL                                                                                                                                                                                                                                                   DN150 FL-FL SLUICE VALVE
   29.     PROVIDE AND INSTALL BRASS KERB MARKERS AT ALL WATER, TELECOM AND
           OTHER SERVICE ROAD CROSSINGS.                                                                    A.     TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.                                                                                                                                                                   4               1         DN150 11.25° PE100 BEND
                                                                                                            B.     CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE
   OTHER NOTES:                                                                                                    STORMWATER SYSTEM. THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT
   30.     ALL DICL BENDS TO BE FLANGED JOINTS.                                                                    CONTROLS AROUND STOCKPILES.
   31.     WHERE PE CROSSINGS ARE USED THRUST RESTRAINT TO BE PROVIDED IN
           ACCORDANCE WITH SEQ-WAT-1211-1                                                                   CREEK CROSSINGS
   32.     FLANGED CONNECTIONS IN ACCORDANCE WITH SEQ-WAT-1313-1                                            A.     SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM OF ANY
   33.     WHERE PE CROSSINGS ARE USED PIPES MAY BE CURVED IN LIEU OF                                              EXCAVATION WORK.
           IMPLEMENTING BENDS IF CLEARANCE TO BURIED SERVICES CAN BE MAINTAINED.                            B.     APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT SEDIMENT
           MINIMUM RADIUS BENDS IN ACCORDANCE WITH PIPA GUIDELINE POP202 (TABLE                                    FROM ENTERING THE CREEK.
           REPRODUCED BELOW)                                                                                C.     NO SOIL SHALL BE STOCKPILED WITHIN 5m OF THE CREEK.
   34.     CLEARANCE TO OTHER SERVICES IN ACCORDANCE WITH SEQ WATER CODE
           CLAUSE 5.12.5.2                                                                                  REHABILITATION
   35.     THE ALIGNMENT OF ALL PIPES SHALL BE DEFINED BY A MARKER TAPE PLACED AS                           A.     PREDISTURBANCE SOIL PROFILES AND COMPACTION LEVELS SHALL BE
           SHOWN AT TOP OF EMBEDMENT. THE TAPE SHALL CONTAIN A CONTINUOUS METAL                                    REINSTATED.                                                                                                                                                                                                                                                                    Check all dimensions before commencement of work.
           STRIP AND BE COLOURED AND PROVIDED WITH A DESCRIPTION OF THE WATER                               B.     PREDISTURBANCE VEGETATION PATTERNS SHALL BE RESTORED.                                                                                                                                                                                                                          Check Site boundary dimensions from the Title plans
           PRODUCT WITHIN.                                                                                                                                                                                                                                                                                                                                                                        Check Building Boundary clearances by set out.
   36.     WATER SERVICES AND CONDUITS SHALL COMPLY WITH SEQ WAT-1108-1, 1108-2                                                                                                                                                                                                                                                                                                                   Notwithstanding the information supplied on this drawing,
           AND 1108-3.                                                                                                                                                                                                                                                                                                                                                                            the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                                                                  services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                                                                  contractor prior to commencement of works.

                                                                                                                                                            Approved
Checked -     CT                                                                                                                                                                                                     Drawing title -                                    Project -   PROPOSED 1 INTO 3                       Site -                                                              Project No.      233467      Sheet No.               C460
Design -    SK          Drawn -   SK              D   24/03/2025   UPDATED PROJECT NAME                SK                                                                                                            WATER RETICULATION NOTES                                       DEVELOPMENT                             62 LAKE MACDONALD DRIVE,                                            Digital Ref :
                                                                                                                                                                                                                                                                                                                                                                                                                 C460 WATER RETICULATION
                                                                                                                                                                                                                                                                                                                                                                                                                 NOTES                     Issue :      D
                                                  C   14/03/2025   UPDATED LOT LAYOUT                  SK
Scales -    AS SHOWN                              B   20/09/2024   ISSUE FOR APPROVAL                  SK                                                   COVEY ASSOCIATES PTY LTD         124 DUPORTH AVENUE                                                         Client -
                                                                                                                                                                                                                                                                                    NOOSA COUNCIL                           COOROY                                                                This Document is copyright and shall not be copied
                                                  A    10/01/24    ISSUE FOR CLIENT REVIEW             SK
                                                                                                                                                            ABN 59 137 305 992               PO BOX 16                                                                                                                                                                                            without written approval, nor shall it be used except
Document Stage -            APPROVAL                                                                                                                        (07) 5443 7777                   MAROOCHYDORE QLD 4558                                                                                                                                                                                for the Development and the Site Specified.
                                                 Issue Date                      Description          By                                                    [email protected]
         c:\12dS\data\12DSERVER\233467_2957\DWG Covey\OPW\Uncontrolled\C460 WATER RETICULATION NOTES.dwg                                                                                                                                                                                                                                                                                       Plot 1 July 2025 - 11:02 AM

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to RFI Sewer & Water Network Plans.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.