 Specific Outcome                                           Probable Solution                                                      Response
         c.     kerb and channel—
              i.     controls vehicle movement by
                     delineating the carriageway for all
                     users;
              ii.    conveys road pavement run-off to
                     stormwater drainage in a manner
                     that allows the road to be
                     trafficable in Q100 ARI local
                     rainfall events; and
         d.     verges and footpaths provide—
              i.     safe access for pedestrians and
                     cyclists clear of obstructions;
              ii.    an access area for vehicles onto
                     properties;
              iii.   a corridor allocated for services
                     and utilities; and
              iv.    additional amenity for minor
                     roads.
 O8      Stormwater drainage infrastructure is             S8.1      Stormwater drainage planning, design and construction is in   R8 Complies
         planned, designed and constructed to—                       accordance with Section 4 of PSP5 Engineering Design
                                                                     Standards – Roads, Drainage and Earthworks;                   The proposed drainage works will comply. See Attachment G –
         a.     be accessible, cost effective and                                                                                  Hydraulic Services Plan.
                easily maintainable;                                 AND
         b.     protect downstream capacity;               S8.2      As Constructed data is submitted in accordance with Section
         c.     protect downstream water quality;                    6 of PSP5 Engineering Design Standards – Roads,
                                                                     Drainage and Earthworks;
         d.     maximise on-site stormwater retention
                and retardation; and                                 AND
         e.     convey run-off to stormwater drainage      S8.3      Stormwater drainage planning, design and construction is in
                in a manner that allows roads to be                  accordance with the Queensland Urban Drainage Design
                trafficable                                          Manual.

 O9      Roads and stormwater drainage                     S9.1      Roads and stormwater drainage infrastructure is constructed   R9 Complies
         infrastructure is constructed—                              in accordance with—
                                                                                                                                   The proposed drainage works will comply. See Attachment G –
         a.     in accordance with appropriate                       a.    Sections 2, 3 and 4 of PSP5 Engineering Design          Hydraulic Services Plan.
                engineering standards; and                                 Standards – Roads, Drainage and Earthworks;
         b.     to minimise adverse environmental                    b.    Queensland Design Code for Residential Streets;
                impacts, including from run-off and                  c.    AUSTROADS; or
                erosion.
                                                                     d.    A combination of the principles in these documents;
                                                                     AND
                                                           S9.2      Erosion and sediment control measures are designed and
                                                                     implemented in accordance with the Institution of Engineers
                                                                     Australia (Queensland Division) Soil Erosion and Sediment
                                                                     Control - Guidelines for Queensland Construction Sites.
 Environmental Protection




December 2017                                                     Cardno                                                            6
Log in to download the original file

Part B - Attachments A to D.PDF · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.