Part B - Attachments A to D
Attached to the e-mail Other Change Application – 132002.220285.5.
Specific Outcome Probable Solution Response
c. kerb and channel—
i. controls vehicle movement by
delineating the carriageway for all
users;
ii. conveys road pavement run-off to
stormwater drainage in a manner
that allows the road to be
trafficable in Q100 ARI local
rainfall events; and
d. verges and footpaths provide—
i. safe access for pedestrians and
cyclists clear of obstructions;
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services
and utilities; and
iv. additional amenity for minor
roads.
O8 Stormwater drainage infrastructure is S8.1 Stormwater drainage planning, design and construction is in R8 Complies
planned, designed and constructed to— accordance with Section 4 of PSP5 Engineering Design
Standards – Roads, Drainage and Earthworks; The proposed drainage works will comply. See Attachment G –
a. be accessible, cost effective and Hydraulic Services Plan.
easily maintainable; AND
b. protect downstream capacity; S8.2 As Constructed data is submitted in accordance with Section
c. protect downstream water quality; 6 of PSP5 Engineering Design Standards – Roads,
Drainage and Earthworks;
d. maximise on-site stormwater retention
and retardation; and AND
e. convey run-off to stormwater drainage S8.3 Stormwater drainage planning, design and construction is in
in a manner that allows roads to be accordance with the Queensland Urban Drainage Design
trafficable Manual.
O9 Roads and stormwater drainage S9.1 Roads and stormwater drainage infrastructure is constructed R9 Complies
infrastructure is constructed— in accordance with—
The proposed drainage works will comply. See Attachment G –
a. in accordance with appropriate a. Sections 2, 3 and 4 of PSP5 Engineering Design Hydraulic Services Plan.
engineering standards; and Standards – Roads, Drainage and Earthworks;
b. to minimise adverse environmental b. Queensland Design Code for Residential Streets;
impacts, including from run-off and c. AUSTROADS; or
erosion.
d. A combination of the principles in these documents;
AND
S9.2 Erosion and sediment control measures are designed and
implemented in accordance with the Institution of Engineers
Australia (Queensland Division) Soil Erosion and Sediment
Control - Guidelines for Queensland Construction Sites.
Environmental Protection
December 2017 Cardno 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.