23688 DA - COMPILED Decision Notice [As Published] · 132004.240015.4
NOOSA COUNCIL IDAS Development Application Decision Notice 5
13. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for building works.
14. This Development Permit for a Material Change of Use of Premises lapses if: -
14.1. the use or erection of a building or other structure associated with the use, has not been
commenced by 28 May 2008, unless application is made and approved by Council for an
extension; or
14.2. the use of any premises pursuant to the Development Permit ceases.
Land Development
Vehicle Access
15. The existing vehicle access driveway shall be removed and replaced with a new vehicular access
driveway. The new driveway shall be constructed from the Arakoon Crescent frontage of the site with a
maximum width of 4.5 metres at the kerb and channel.
The new driveway shall be designed and constructed to Council’s design standards and to grades that
prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
footpath without any level difference. Should any driveways be constructed to grades that do not comply
with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
16. A Road/Footpath Permit shall be completed and submitted for the construction of the access driveway in
accordance with Council’s Local Law No.8. If approval is given the driveway shall be constructed in
accordance with Council’s standard drawings, which will be provided at time of approval.
17. All redundant vehicle crossovers shall be removed and kerb and channel reinstated and footpath area
repaired with turfing.
Carparking
Off Street
18. Deleted.
Stormwater Drainage
19. All stormwater drainage shall be collected on site and discharged to Council’s existing drainage structures
in Arakoon Crescent together with on site disposal via absorption pits. The pits shall be installed in a
manner that does not compromise the stability of the site. The stormwater and roof runoff disposal shall
be generally in accordance with Sunshine Coast Geotechnical Pty Ltd Drg No. 14024-SW dated April
2004 and the related geotechnical assessment for the absorption pit design.
Earthworks
20. All earthworks shall be carried out in accordance with the geotechnical report prepared by Sunshine
Coast Geotechnical dated 2 February 2004 and referenced 14024 (S) and the following criteria;
No vibratory techniques shall be utilised on site, including pier installation.
All new parts of the building shall be supported on normal bored, grout injected or steel screw piers
(as designed by a specialist contractor) and founded in the medium dense sand profiles.
All excavations must be adequately retained to prevent collapse. Where retaining walls are
required an exposed cut batter of 1 to 2 (vertical to horizontal) taken for the base of any foundation
can be excavated.
Any permeable retaining structure should incorporate a membrane to allow water migration but
inhibit that of sand.
KP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23688 DA - COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 45 KB (small file)
- File type
No other editions are linked here.