1909-13367 SRA RA6-N Response with conditions
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
1909-13367 SRA
No. Conditions Condition timing
Region ([email protected]) within the
Department of Transport and Main Roads confirming that the
development has been constructed in accordance with parts
(a) and (b) of this condition.
6. Roadworks to Myall Street must be designed and constructed to Prior to the
be in accordance with the following to accommodate a single unit commencement of
rigid bus of 12.5m in length: use for Stage 1
Department of Transport and Main Roads Road Planning
and Design Manual, 2nd Edition, Volume 3 – Guide to
Road Design (March 2016);
Department of Transport and Main Roads Supplement to
Austroads Guide to Road Design (Parts 3, 4-4C and 6);
Austroads Guide to Road Design (Parts 3, 4-4C and 6);
Austroads Design Vehicles and Turning Path Templates;
Department of Transport and Main Roads Queensland
Manual of Uniform Traffic Control Devices, Part 13 Local
Area Traffic Management (March 2018); and
Chapter 2 - Planning and Design, Section 2.3.2 Bus
Route Infrastructure (page 6) of the Department of
Transport and Main Roads Public Transport Infrastructure
Manual 2015.
7. Roadworks to Myall Street must be designed and constructed in Prior to the
accordance with the following to accommodate cyclists: commencement of
use for Stage 1
Department of Transport and Main Roads Road Planning
and Design Manual.
Department of Transport and Main Roads Cycle
Infrastructure Policy.
Vehicular access to state-controlled road
8. (a) The road access locations are to be located generally in (a) At all times
accordance with Master Plan, prepared by Jared Poole
Design, dated 3 December 2010, reference BP1074/SK2.01,
issue R; as amended in red (b) - (d) Prior to the
commencement of
use and to be
(b) Road access works comprising the Main Access must be
provided generally in accordance with: maintained at all
times
(i) Institute of Public Works Engineering Australasia
(IPWEA) Standard Drawing RS-051 Rev H, General
Wide Flared, Driveways Heavy Duty Vehicle
Crossing; and
(ii) Channelised Right Turn and Auxiliary Left Turn
Treatment (CHR and AUL) turn treatments from Myall
St into Lot 2 on SP115864;
at the road access location.
(c) Road access work comprising the Emergency Access must
be provided Generally in accordance with Institute of Public
Works Engineering Australasia (IPWEA) Standard Drawing
RS-056 Rev F, Driveways Rural Driveway, at the road access
location.
Department of State Development, Manufacturing, Infrastructure and Planning Page 6 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original