2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 39, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) d) if there is no valid development permit for the site, disturbed areas are revegetated using species identified in PSP3 - Landscaping Plants and Guidelines; AND $4.2 Earthworks are undertaken only during the hours of 7am to 6pm, Monday to Friday and 7am to 6pm on Saturday. No work is undertaken on Sunday or public holidays. d) Revegetation as required e) Complying with working hours requirements Managing contamination risk O6 Materials used as fill are suitable for development of the land and filling or excavation works do not result in the contamination of land. S6.1 The fill material is solid clean earth, free of putrescible or refuse material, vegetation, acid sulfate soils, building or construction material or other material or contaminants; AND S6.2 The site is not on the contaminated land register. The documentation prepared for the construction phase will include appropriate control measures required including: a) control off fill materials to ensure it is solid clean earth, free of putrescible or refuse material, vegetation, acid sulfate soils, building or construction material or other material or contaminants Haulage activity and amenity O7 Haulage of material to and from a site ensures— a) minimal disturbance to neighbouring properties and properties along the haulage route; and b) Council’s road infrastructure including No solution provided During the construction phase traffic management and environmental management plans will be prepared by the Principal Contractor to manage the hauling of material and to address infrastructure impacts and disturbance. 10|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.