2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 40, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) pavements is not adversely affected. Extent of earthworks O8 Earthworks are contained within the subject property S8.1 All earthworks, including cut and fill batters, retaining walls etc are contained within the subject site. The earthworks design will ensure all earthworks for the internal development works, including cut and fill batters, retaining walls etc are contained within the subject site Sloping sites O9 On sloping sites, excavation or filling are designed to maximise the use of natural slope and minimise the need for cut and fill. $9.1 Cut or fill is less than 2m in depth relative to the natural ground surface. The earthworks design will ensure and optimised design to maximise the use of the natural slope and minimise the need for cut and fill whilst addressing the requirements for access and drainage. Where cut and fill is necessary the depth will be restricted to less than 2m relative to the existing ground. Division 15—Erosion and Sediment Control Code Table 14-53 —Erosion and sediment control 14.124 Effects of works Erosion and drainage control, sediment capture and stormwater runoff O1 Development design, density, layout, and staging provide for erosion control, drainage control and sediment capture and treatment during the construction phase $1.1 Construction works are designed, planned and executed with respect to the principles of erosion reduction, drainage management and sediment capture in accordance with Appendix 2, Table A of the Queensland State Planning Policy and International Erosion Control Association Best Practice Erosion and Sediment Control (BPESC) 2008; AND $1.2 Construction works are designed and An erosion and sediment management plan will be prepared for the construction stage. This shall require works to be designed, planned and executed with respect to the principles of erosion reduction, drainage management and sediment capture in accordance with Appendix 2, Table A of the Queensland State Planning Policy and International Erosion Control Association Best Practice Erosion and 11|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.