2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17

Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

Castaways — 2 David Low Way, Castaways Beach
Civil Works, including drainage, earthworks, erosion and sediment
control, waste management and services

 

Column 1 Specific
Outcomes

column 2 Probable
solutions (if code
assessable)

 

pavements is not adversely
affected.

 

Extent of earthworks

O8 Earthworks are
contained within the subject
property

S8.1 All earthworks,
including cut and fill batters,
retaining walls etc are
contained within the subject
site.

The earthworks design will
ensure all earthworks for
the internal development
works, including cut and fill
batters, retaining walls etc
are contained within the
subject site

 

Sloping sites

O9 On sloping sites,
excavation or filling are
designed to maximise the
use of natural slope and
minimise the need for cut
and fill.

 

$9.1 Cut or fill is less than
2m in depth relative to the
natural ground surface.

 

The earthworks design will
ensure and optimised
design to maximise the use
of the natural slope and
minimise the need for cut
and fill whilst addressing the
requirements for access and
drainage. Where cut and fill
is necessary the depth will
be restricted to less than
2m relative to the existing
ground.

 

 

Division 15—Erosion and Sediment Control Code

 

Table 14-53 —Erosion and sediment control

 

14.124 Effects of works

 

Erosion and drainage
control, sediment capture
and stormwater runoff

O1 Development design,
density, layout, and staging
provide for erosion control,
drainage control and
sediment capture and
treatment during the
construction phase

 

 

$1.1 Construction works are
designed, planned and
executed with respect to
the principles of erosion
reduction, drainage
management and sediment
capture in accordance with
Appendix 2, Table A of the
Queensland State Planning
Policy and International
Erosion Control Association
Best Practice Erosion and
Sediment Control (BPESC)
2008;

AND

$1.2 Construction works are
designed and

 

An erosion and sediment
management plan will be
prepared for the
construction stage. This
shall require works to be
designed, planned and
executed with respect to
the principles of erosion
reduction, drainage
management and sediment
capture in accordance with
Appendix 2, Table A of the
Queensland State Planning
Policy and International
Erosion Control Association
Best Practice Erosion and

 

11|Page

2/06/2017

 
Log in to download the original file

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17.pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.