Original source · versioned page text
2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) managed to restrict the extent of clearing and soil exposure to that necessary for access, and safe construction; AND $1.3 Clean stormwater is diverted or managed around or through the site without increasing the concentration of total suspended solids or other contaminants in the flow and without causing erosion (onsite or offsite); AND $1.4 Cleared areas are effectively stabilised prior to rainfall if works are delayed or works are not intended to occur immediately; AND $1.6 For buildings, a) upstream runoff must be diverted around the construction site; and b) sediment barriers are provided downslope of disturbed areas to prevent sediment washing into gutters, drains and watercourses either on or off the site; and c) exposed soil and construction access must be managed in accordance with International Erosion Control Association Best Practice Erosion and Sediment Control (BPESC) 2008; and Sediment Control (BPESC) 2008 Clearing shall be carried within the development except in the defined areas of the easements or covenants The erosion and sediment control measures shall divert or manage clean stormwater around or through the site without increasing the concentration of total suspended solids or other contaminants in the flow and without causing erosion (onsite or offsite) Cleared areas shall be effectively stabilised prior to rainfall if works are delayed or works are not intended to occur immediately. The proposed development includes defined building envelopes but does not include any buildings at this stage. 12|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.