Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17

Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

Castaways — 2 David Low Way, Castaways Beach
Civil Works, including drainage, earthworks, erosion and sediment
control, waste management and services

 

Column 1 Specific
Outcomes

column 2 Probable
solutions (if code
assessable)

 

 

 

managed to restrict the
extent of clearing and

soil exposure to that
necessary for access, and
safe construction;

AND

$1.3 Clean stormwater is
diverted or managed
around or through the site
without increasing the
concentration of total
suspended solids or other
contaminants in the flow
and without causing
erosion (onsite or offsite);
AND

$1.4 Cleared areas are
effectively stabilised

prior to rainfall if works are
delayed or works are

not intended to occur
immediately;

AND

$1.6 For buildings,

a) upstream runoff must be
diverted around

the construction site; and
b) sediment barriers are
provided downslope

of disturbed areas to
prevent sediment washing
into gutters, drains and
watercourses either on or
off the site; and

c) exposed soil and
construction access must be
managed in accordance
with

International Erosion
Control Association Best
Practice Erosion and
Sediment

Control (BPESC) 2008; and

 

Sediment Control (BPESC)
2008

Clearing shall be carried
within the development
except in the defined areas
of the easements or
covenants

The erosion and sediment
control measures shall
divert or manage clean
stormwater around or
through the site without
increasing the
concentration of total
suspended solids or other
contaminants in the flow
and without causing
erosion (onsite or offsite)
Cleared areas shall be
effectively stabilised prior to
rainfall if works are delayed
or works are not intended
to occur immediately.

The proposed development
includes defined building
envelopes but does not
include any buildings at this
stage.

 

12|Page

2/06/2017

 
Log in to download the original file

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17.pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.