2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 42, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) d) temporary or permanent downpipes are connected to the stormwater system before laying the roof; or e) localised erosion is avoided by directing flow from downpipes over non- erosive areas. O2 Works in a watercourse Construction activities within watercourses are planned to prevent erosion, construction failure and associated sedimentation. $2.1 Work within waterways must be undertaken in accordance with Best Practice Erosion and Sediment Control, Appendix | — Instream works, Sections 14 and 16 International Erosion Control Association 2008. $2.2 Temporary vehicular crossings of waterways must be designed and constructed to convey flows for the SO%AEP event and remain stable for all rainfall events up to 10%AEP event. There is no proposed work within watercourses except the potential need for the construction of a stormwater outfall. Any work shall be undertaken in accordance with Best Practice Erosion and Sediment Control, Appendix I =— Instream works, Sections 14 and 16 International Erosion Control Association 2008 Division 16 — Existing Services Code Table 14-54 Existing Services Setbacks and easements O1 Development near a sewer, water main, stormwater drain, overland flow path or associated structure does not— a) adversely affect the function of the service; b) place an additional load on the service; and $1.1 The footing of any structure or building is located clear of the zone of influence but no closer than 1.5m (measured horizontally) from infrastructure including sewers, water mains and stormwater structures; AND $1.2 No building or No existing services to be retained exist within the development site and therefore the development will not adversely affect the function of the service, place an additional load on the service or unduly increase future maintenance costs 13|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.