Skip to the record
Accept no substitutions.

Original source · versioned page text

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17

Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 43, section 1. The text section number identifies this passage in the reader.

Castaways — 2 David Low Way, Castaways Beach
Civil Works, including drainage, earthworks, erosion and sediment
control, waste management and services

 

Column 1 Specific
Outcomes

column 2 Probable
solutions (if code
assessable)

 

c) unduly increase future
maintenance costs

structure overhangs the
zone of influence;

AND

$1.3 Finished surface levels
maintain a minimum of
600mm of cover, but no
greater than 3m of cover to
the underground
infrastructure;

AND

$1.4 If the existing surface
level is altered, surface level
services including manholes
and inspection points are
altered to match the new
surface level;

AND

$1.5 Alterations are
constructed in accordance
with Section 4 of PSPS —
Engineering Design
Standards — Roads, Drainage
and Earthworks and
applicable water and
sewerage design standards;
OR

$1.6 Existing services are
relocated and the design
and construction of the
relocated services is in
accordance with Section 4
of PSP5 —Engineering Design
Standards — Roads, Drainage
and Earthworks and
applicable water and
sewerage design standards

 

O2 Maintenance access is
provided to all sewers,
water mains, stormwater
drains, overland flow paths
and associated structures.

 

 

$2.1 For trunk infrastructure
a registered easement in
favour of Council is created
over all underground
infrastructure located in
private property; AND

 

There is no trunk
infrastructure located
within the private property.

An easement is proposed
for the new sewer
connection to the existing

 

14|Page

2/06/2017

 
Log in to download the original file

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17.pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.