b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Damage to infrastructure
30. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Litter, erosion and sediment control
31. All waste materials must be removed from site. Litter, erosion and sediment control
Litter, erosion and sediment control measures must be installed and maintained until
soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
water drainage system (e.g. roadside gutter).
Asbestos
32. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
33. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the
work commences. Notification must be made using Form 65: Notification of licensed
asbestos removal work, demolition work or emergency demolition.
34. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science
licenses businesses that transport asbestos waste, and landfills that accept this waste.
35. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
36. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point
for a service provider’s sewerage system must be sealed watertight. This work is
deemed as notifiable Work and must be carried out by a suitably licenced plumber who
must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC
(Queensland Building Construction Commission) within 10 days of completing the
work.
B. Include the following advisory note in addition to that standard advisory notes :
Activities within Road Reserve/Pathways/Car spaces
1. Safe vehicle and pedestrian access in the vicinity of the development must be
maintained at all times. Should closures of footpath/roads/carspaces be necessary to
carry out construction works, a permit from Council’s Infrastructure Section must be
obtained prior to any works being undertaken.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 31 of 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.