Skip to the record
Every meeting, every word.

Original source · versioned page text

Decision Notice - Approved by Delegation of Authority - MCU25 0067 (As Published)

of 12
                      Waste Management
               20.    A waste storage area must be designed and maintained in accordance with Planning
                      Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
                      The waste storage area must be:
                      a.      imperviously paved and correctly sized for all refuse and recycling containers;
                      b.      bunded and graded so that wastewater and bin leakage drain to the sewer;
                      c.      provided with a conveniently located hosecock and backflow prevention device,
                              connected to a water supply to service the area; and
                      d.      roofed or otherwise covered.
                      Community Management Statement
               21.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               22.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and, in particular, must include the following
                      additional clauses:
                      a.      The dwelling units are not permitted to be used for short term accommodation, unless
                              where there is a Development Permit for Material Change of Use for Short Term
                              Accommodation in effect.
                      Landscape Works
               23.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      The works shown on the approved Landscape Concept Plans;
                      b.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage.
               24.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               25.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
               26.    All planting areas on the eaves must be planted and maintained at all times, with replacement
                      planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
                      Retention of Existing Trees
               27.    All works must be carried out under the supervision of a qualified person* in accordance with
                      sections 9 and 10 of the Arborist Report listed within this Decision Notice.
                      *(Refer to Advisory Note)
               28.    Prior to the issue of an operational works approval, a bank guarantee or a bond of $5000
                      must be lodged as security for the protection of the tree/s identified for retention in sections
                      9 and 10 of the Arborist Report listed within this Decision Notice. The bond:
                      a.      may be drawn upon by Council in its entirety any one tree identified for retention is
                              damaged to the point where the tree cannot be saved (as confirmed by the project
                              arborist and agreed in writing by Council)
                      b.      will be returned upon practical completion of all the operational works relating to this
                              development.



                                                                                                        Page 5 of 12
Document Set ID: 25052313
Version: 4, Version Date: 14/08/2026

Log in to download the original (Decision Notice - Approved by Delegation of Authority - MCU25 0067 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.