Council archive · source document
Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
97.6 weed and pest control (particularly mosquitoes and cane toads);
97.7 management of Private Open Space areas;
97.8 protection of wildlife and their habitat;
97.9 bushfire prevention and control and include the Bushfire Information kit;
97.10 management and control of domestic pets,
97.11 energy efficient living;
97.12 management and maintenance of water conservation facilities (eg. rainwater tanks).
98 The Operational Stage Environmental Management Plan shall incorporate all amendments to
the Plan of Development and address all relevant Conditions of Approval. It shall also reference
all relevant Local Laws and Policies and legislation.
99 The developer and all future owners of the site shall comply with the Operational Stage
Environmental Management Plan and compliance with it shall be referenced in any community
management statement for any group title development over the site.
Sediment and Erosion Control Plan
100 Detailed staged Sediment and Erosion Control Plans shall be prepared for the site, to the
reasonable satisfaction of Council, and in accordance with the Institution of Engineers Australia
‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in
particular using Checklist No. 3 from that document. The Sediment and Erosion Control Plans
shall cover all development on site (during the construction and operational stages), ecological
restoration, landscaping and remediation works.
101 The Sediment and Erosion Control Plans shall also apply to all areas of Open Space and shall:
101.1 identify existing erosion problems, and
101.2 specify appropriate remedial actions.
102 All necessary erosion and sediment control works and devices shall be provided by the
Developer.
Stormwater and Water Quality Management Plan
103 Prior to approval for a Development Permit for Operational Works, a Stormwater and Water
Quality Management Plan for the site shall be prepared to the reasonable satisfaction of Council.
It shall generally be in accordance with the Stormwater Management Plan prepared by 4 Site
(dated August 2003) amended in accordance with 4Site’s letter to Council of 6 November 2003
and their letter of 24 February 2004 and to be consistent with the amended plan of development
by Conics dated 12 September 2008. However, it shall incorporate all amendments to the Plan
of Development and address all relevant Conditions in this Approval.
104 The Stormwater and Water Quality Management Plan shall take into account matters specified
in section 19.4 of the Environmental Protection (Water) Policy 1997.
105 Key water quality objectives to be reflected in the Stormwater and Water Quality Management
Plan are for the protection of aquatic ecosystems in the lake and wetlands of the site and the
receiving waters of Weyba Creek.
106 The Stormwater and Water Quality Management Plan shall comply with and address, inter alia,
the following issues in relation to the construction, establishment and operational stages of the
development.
106.1 With the exception of the two approved detention basins located on the floodplain, all
necessary stormwater treatment and water quality devices associated with the
development shall be located within the ‘urban footprint’. They shall not be located in
‘Conservation Parkland’.
Page 15 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.