Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
115.1 collection areas for refuse and recycle bins for the group title areas.
115.2 bin wash facilities for group title areas.
115.3 location and servicing of public street letter bins at parks, pool, jetty and other areas of the
site.
116 Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located
in a manner which prevents a noise nuisance beyond the subject land in accordance with the
nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply
for such offences.
117 Noise emission from air conditioning equipment shall comply with the following requirements:
117.1 The equipment shall be installed and located in a manner which prevents noise nuisance
beyond the subject land in accordance with the nuisance provisions of the Environmental
Protection Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances.
Infringement Notices (on-the-spot fines) may apply for offences.
117.2 Submission of written certification from a suitably qualified person confirming that the noise
levels comply when measured at the nearest residential boundary. This is required
immediately after installation of the equipment and prior to any occupation of the building,
and in a format approved by Council.
117.3 A person must not use equipment on any day if it makes or causes noise to be made –
117.3.1 Before 7am or after 10pm: More than the lower of either –
40 d(B)A
3 d(B)A above the background noise level
117.3.2 From 7am to 7pm: More than the lower of either –
50 d(B)A
5 d(B)A above the background noise level
117.3.3 From 7pm to 10pm: More than 3 d(B)A above the background noise level.
118 As the proposal is to be located in close proximity to residential areas, a Noise Exposure
Forecast/Plan from an acoustic consultant shall be submitted with respect to possible noise
emissions during construction. This Forecast/Plan must include the following:-
118.1 The measures to be taken under the plan to minimise the adverse effects of the operations
on the environmental values;
118.2 Persons responsible for carrying out each of the measures;
118.3 Maximum, Leq, L10, L90 and background levels for the operations;
118.4 Noise monitoring to be undertaken for the operations;
118.5 Processes for dispute resolution that the applicant must follow to deal with complaints
received about the impact of the noise from the operations;
118.6 How compliance with the Environmental Protection Regulation 1998 for noise emissions is
to be achieved.
119 Adequate control measure must be implemented by the Body Corporate to control noise and
lighting emissions from the tennis courts
Land Development
General
120 For the purpose of these conditions, the following definitions apply: -
Page 18 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.