Council archive · source document
Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
120.1 A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed
by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
120.2 A Registered Professional Civil Engineer means an engineer who is registered with the
board of Professional Engineers of Queensland..
120.3 Carparking area means a parking area as defined in the Schedule to the Shire of Noosa
Planning Scheme inclusive of manoeuvring areas and access from the roadway.
120.4 The person acting on this permit means any person or company who undertakes
development pursuant to this permit.
120.5 AS 2890.1 – 1993 means Australian Standard for Off Street Carparking - AS 2890.1-1993.
120.6 Principal Contractor means the person nominated by the Applicant and approved by the
Manager - Land Development at a pre-start meeting as being responsible for the major
component of works associated with a Development Permit for Operational Works of any
works on the site.
121 The lot reconfiguration shall be in accordance with Drawing No 6994-53M Revision M prepared
by Conics and dated 12 September 2008 as modified herein.
122 Pursuant to Section 3.5.21(6) of the Integrated Planning Act 1997, the currency period is four (4)
years from the day this permit takes effect during which time all conditions must have been
complied with, operational works completed, and the Plan of Survey lodged with the Council for
endorsement.
123 In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with the
fees prescribed in Council's adopted fee schedule.
124 Pursuant to Section 3.7.3(b) of the Integrated Planning Act, all outstanding rates and charges
due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to
endorsement of the Plan of Survey for each stage.
125 An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to
Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
Street lighting and pathway lighting throughout the subdivision shall have a high energy efficient
rating to the reasonable satisfaction of Council and shall generally be provided in accordance
with the principles of Council’s Engineering Design Standards, section 11.3.3.
126 The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the proposed lots. In this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
127 Prior to undertaking any excavation, the person acting on this permit shall contact public utility
service providers to ascertain the location of their underground services.
Page 19 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.