Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
The Community Management Statement shall include the requirement for vehicles to be
parked so that they do not protrude more than 5.4 metres from the garage doors and do
not protrude within 3 metres of the back of kerb.
Carparking
134 On Street parking spaces shall be located on the opposite side of the road to that of the swale
drains. In the case R6 where the swale drain is located on the same side of the road to the
indented parking, a piped system shall be provided.
135 Carparking shall be provided within the site as shown on drawing number C5093/03/L4a
Preliminary Street Network Plan dated 12/08/03 by Tate Professional Engineers, except as
modified herein.
136 The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for user
class 3.
Roads
137 Road shall be constructed in accordance with the widths set out in Council’s Engineering
Standards with the exception of Road R3 which may be constructed to a width of 8 metres kerb
to kerb. Road reserve widths shall be in accordance with Drawing No 6994-53M Revision M
prepared by Conics and dated 12 September 2008.
138 Roads widths within the Group Housing areas will be set prior to the issue of a development
permit for these areas.
Roadworks Contributions
139 A roadworks contribution of $2,711.45 per additional lot for each stage towards the Coastal
Major Road Network shall be paid to the Council prior to endorsement of the Plan of Survey for
the stage. This amount will be subject to variations in the Price Index, All Groups Brisbane from
September 2003 until the date of payment.
Frontage Works
140 Footpath improvements such as topsoiling, grassing, and tree planting are required to all street
frontages in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass
shall be couch, free of weeds.
141 A new 1.5 metre wide concrete path shall be constructed along the length of R1, R2 (from Lot 1
to Lot 21) and R3 in accordance with Council’s design standards. Care shall be taken to protect
any significant vegetation or any underground services.
142 A pram ramp shall be installed at the intersection of R2 and R3 and at the intersection of R3
and R8 in accordance with Council’s Standard Drawing 9006.
143 The paths and pram ramp shall be designed and constructed to ensure pedestrian safety using
non-slip materials and to produce an evenly graded surface finish.
Pathway Construction
144 A 2.0 metre wide concrete shared pathway shall be constructed along the Weyba Creek
frontage of the site as shown on plan Drawing No 6994-53M Revision M prepared by Conics and
dated 12 September 2008 shall connect to the Eenie Creek Road reserve bikepath/pathway at
the proposed bicycle gate.
145 1.5 metres wide concrete pathway shall be constructed along the rest of the pathway network
indicted on Drawing No 6994-53M Revision M prepared by Conics and dated 12 September
2008, with the exception of the section negotiating the escarpment which will be decided upon at
operational works stage.
Page 21 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.