Pathway Contributions
146 A pathway contribution of $235.75 per additional lot for each stage towards external major
pathways, in accordance with Planning Scheme Policy PSP41 Coastal Major Pathway
Contributions, shall be paid to the Council prior to endorsement of the Plan of Survey for the
stage. This amount will be subject to variations in the Price Index, All Groups Brisbane from
September 2003 until the date of payment.
Sewer Mains
147 The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
148 The sewerage network will be generally in accordance with Tate Professional Engineers
Drawing No. C5093/03/L6a Preliminary Water and Sewer Layout Plan dated 12/08/03.
149 A Sewer Master Plan is required to be submitted for approval in conjunction with the application
for a development permit.
Town Water Supply
150 The water supply network will be generally in accordance with Tate Professional Engineers
Drawing No. C5093/03/L6a Preliminary Water and Sewer Layout Plan dated 12/08/03.
151 A Water Supply Master Plan is required to be submitted for approval in conjunction with the
application for a development permit.
152 The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
153 Each water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
154.Registered easements shall be created over all proposed Council water mains within the
property. The easements shall generally be parallel to and centred over the water main and be
equivalent in width to twice the depth to invert level of the water main at the deepest point within
the allotment (measured from the finished surface) and be no less than 3.0 metres wide. In this
regard, plans submitted for Operational Works approval shall accurately show the location of the
easements.
Where a Council water main coincides with an internal road reserve, the road reserve is to be
dedicated as a water supply easement to provide maintenance access.
In addition to this, the Applicant’s solicitor shall give Council’s solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easements shall be submitted to Council for perusal prior to the use
commencing. Any changes required by Council’s solicitor must be corrected immediately.
Service Easements
155. The access easement for maintenance of Council’s trunk main adjacent to Eenie Creek Road
along the proposed access to 12 and 13, as indicated on Drawing No 6994-53M Revision M
prepared by Conics and dated 12 September 2008, shall be an all weather access track
(including across the open space) to be constructed by the applicant at no cost to Council.
Page 22 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.