oil will be pre-treated by GPT’s. Since the catchment to the Northern
Bioretention Basin is smaller than 5ha and does not contain significant
areas of car parking or road, a sediment forebay is proposed.
66 Stormwater Quality Treatment Devices to Bioretention Basins and the Pond have been designed accordingly.
be designed in accordance with Healthy Details are provided in Section 2.1 and Section 3.1 of the SMCMP
Waterway and Water By Design Report.
guidelines.
67 Stormwater design and maintenance The criteria and framework for design, construction and operational
strategy in accordance with Council’s maintenance for stormwater devices is in accordance with the
approved Framework Letter Report (No. Framework Letter Report approved by Council. Refer to the SMCMP
B14158.W.07L dated 8 October 2015) Report for details.
68 The SMCMP Report to be in accordance The SMCMP Report has been written in accordance with this approved
with Council’s approved Framework document.
Letter Report (No. B14158.W.07L dated
8 October 2015)
69 Owner responsibility for construction, This condition is stipulated in this report.
maintenance and repair costs of
stormwater management devices.
70 Calculations to demonstrate runoff to Energy dissipaters (i.e. rock scour protection) have been provided at
northern swale within the site will not drainage outlets into the northern site swale. Energy Dissipation
cause scour. Calculations and Manning’s Sections (comparing existing and
developed conditions of the swale) are provided in Appendix A of the
SMCMP Report.
71 Any waters captured to be plumbed and The capture of all water for external uses was not proposed as part
used for external or non-potable uses. of the previously approved MCU submission. The capture of all
water on site is not required for the site to meet both Stormwater
Quality and Quantity Objectives to be achieved and is therefore not
proposed or required.
72 Developed peak flows from the site As per response to Condition 63, Section 3.2.6 of this report
during the 63% AEP storm event to be demonstrates that proposed detention basins are adequate in reducing
reduced back to or below existing levels. peak flows to meet this condition.
73 Performance bond to be provided to Monitoring and maintenance costs are detailed in Appendix A of the
Council equivalent to 150% of the value SMCMP Report. A performance bond will be provided to Council for the
of monitoring and maintenance of the first 5 years of full operation of the pond.
water bodies.
16-001014-01 | STORMWATER MANAGEMENT PLAN (SWMP) COOROY RETIREMENT COMMUNITY, TRADING POST
| PALM LAKE RESORTS ROAD, COOROY |4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.