Appendix G - development permit 132007.2398.02
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application G - Original Development Permit & Approved Plans Email 8 of 8.
132007.2398.02
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant
shall be wholly at the applicant’s expense and shall not entail a financial encumbrance
on future purchasers of the proposed lots.
86. The requirements of ENERGEX shall be satisfied in relation to any existing services
traverse the site. Written confirmation by ENERGEX that satisfactory arrangements have
been made to formalise any required easements and/or existing informal services shall
be submitted prior to Council endorsing the Plan of Survey.
87. Streets lighting and pathways lighting throughout the development site must be provided
in accordance with Australian Standards.
88. Street lighting shall be provided along Pearsons Road frontage of the site in accordance
with Australian standards.
Telecommunication
89. The requirements for TELECOMMUNICATION services shall be satisfied in relation to
the provision of new telephone services to the developed site. In this regard written
confirmation from an approved telecommunication agency shall be submitted to the
Council prior to Council endorsing the Plan of Survey.
Erosion and Sediment Control
90. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
Contributions Towards Council Infrastructure
91. Monetary contributions shall be paid to Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An
estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
PSP 17 PSP 16 PSP 20 Rural / Local PSP 12 TOTAL
Water Sewerage Pathway Roadworks Public (at CPI
STAGE Supply Headworks Trunk Open December
Headworks Network Space 2014)
(Park)
Stage 1a $185,879 $183,787 $33,382 $22,694 $72,876 $498,618
Stage 1b
(Aged Care $161,040 $158,522 $45,162 $15,151 $95,881 $475,756
Facility)
Stage 2 $322,908 $349,644 $58,711 $40,623 $128,170 $900,056
Stage 3 $165,594 $179,305 $30,108 $20,833 $65,728 $461,568
TOTAL = $835,421 $871,258 $167,363 $99,301 $362,655 $2,335,998
Please note that these amounts are all subject to variations in the Consumer Price
Index, All Groups Brisbane from December 2014 until the date of payment. All
contributions must be paid prior to commencement of use.
Page 11 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.