92. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
application for Operational Works.
93. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational
Works in respect of roadworks and stormwater drainage works. The design shall be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes
or services, all existing and proposed services required by the development shall be
shown on the plans.
94. To facilitate production of As Constructed drawings it is suggested that all design
drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
(Guidelines on the use of ADAC are available at www.adac.com.au).
95. A construction management plan/strategy shall be prepared by a suitably qualified
Registered Professional Engineer and submitted to Council in conjunction with any
application for Operational Works. The construction management plan shall ensure no
damage occurs to Council services and that any adverse impact on the local area due to
the construction works is within the acceptable limit and properly managed to the
satisfaction of Council.
96. A Traffic Management Plan for the each separate demolition and construction phase of
the development shall be submitted to and approved by Council at least 5 working days
prior to the commencement of any Demolition or Building works or at least 5 working
days prior to the pre-start meeting for Operational Works. The Traffic Management Plan
shall include but not be limited to:
96.1 Mitigate any adverse impact and disturbance on the local residential area and on
the traffic in the local and main roads to acceptable limits;
96.2 Mitigate dust disturbance caused by vehicles and machinery movements;
96.3 Limiting the routes for the heavy vehicles to the major road network and limit the
use of the local roads within residential area as access to the site;
96.4 Indicate provision for on-site and off-site parking for the required workforce;
96.5 Indicate the location of loading and unloading areas;
96.6 Indicate the location of any “holding” areas for heavy vehicles and
96.7 Operating hours.
It is be noted that the Elm Street frontage of site shall not be used for access, parking or
loading and unloading during construction (and post construction) phase unless a
specific written permit obtained from the Department of Main Roads.
97. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
98. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
Page 12 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.