Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

NOOSA AQUATICS CENTRE UPGRADE PLAN AND NOOSA AQUATICS FACILITIES STRATEGIC PLAN · Attachment 1 NAC Upgrade Plan

of 8
fos
                                                                                                                                            ASSOCIATED DOCUMENTS
                                         PE                                                                                                 Ensure all upgrade plan sheets are read in           NOOSA AQUATIC CENTRE UPGRADE                                       PLAN
                                  nae                                                                                                       conjunction with each other, including the                                       MAIN       FACILITY AREA sheet 2 of 7
                                                                                                                                            prioritised implementation plan (PIP) which
                                                                                                                                            elaborates on the upgrade plan legend and                                                    6 Girraween Ct, Sunshine Beach
                                                                                                ye                                          listed improvements.
                    y
                                                                                                                                            NOTE                                                   Rationalise and refit the southern         Lon  term movable and traversable
                                                                                                                                                                                                   storage shed with shelving and lockers     bulkhead including possible pool
                                                                                                                   at               ES      This upgrade plan drawing is conceptual only           for L  and club use, add entry doors,      extension subject to feasibility study
                                                                                                               ew WS                        and shall not be used for tendering and/or             repaint to match the new colour
                                                                                                   en             —                         construction purposes. A detailed survey of            scheme, and consider hireable storage      New aquatic LED scoreboard
                                                                   ars.                                             ea                      the site has not been undertaken. All works            options for community clubs
                                                                     -
                                                                                                                                                                                                                                              New additional planting north of pool
                                                                                                                          lk                are subject to Council approval. Future                Demolish existing fencing,
                                              -                                   a ca      aT         |                                    architectural and structural engineering               incorporate screen planting to             New BBQ/picnic zone for club and
                                                                                                                                            detailed design shall refine building works.           storage shed and widen footpath            public use
                                                                                     Je     i)                                              Future civil engineering design shall refine car       access to upgraded storage shed            Replacement of existing retaining
                                                                                         5          Wiha                                    park layout.                                           New raised deck flush to                   walls and upgrade of gardens
                                                                                        a ae                                                                      a          |                     Wellness Hub building floor level          New designated entry for school/
                                                                                           rm                                                                                                      with cafe seating and shade structures
                                                                                      ia                                                                                                                                                      large group access
                                                                                      i  ! Hi    ile                                                                                               Upgrade and extend caretaker
                                                                               \ heh    a           1 |                                                       ed                                   residence to create Wellness Hub           Proposed new spectator shelter with
                                                                                                   lt
                                                                                               1 |                                                                                                 building accommodating reception
                                                                 Se            met at       ‘                                       :            (ee aa                  Gu                        area, program rooms, meetin                bench seating or extension area
                                                                                 at y )  he |  i     | l                                                                                                     extended mat exercise studio     shown as dashed line) to allow for a
                                                                                 |   A      PUR WN     at                          Ps                                                              room an                                    arger gym and multi-purpose room
                                                                      pf 4            a                                                                                                                                                       in proposed changeroom, creche, gym
                               St                               4              i}     i      if | a   it!                                        }                    |                            Upgrade existing gardens, lift prune       and multi-purpose room building,
                                                       —                              iy                                           !         i       —     a ee                                    existing trees, lay turf, retain water     options for further embellishment are
7                                                                              LM     tay  a                                           s  A                                                        tanks, provide screening under             to be investigated subject to Council
                             nya                                  —s               ya ays   i       1 om    Lm                     S                   i   ;   Cl     |  |   |                     building and ensure chainwire fence        approval, funding and feasibility
                            a                                      ee ae              Be             ee    -                                 Rent                     |                            aligns with biodiversity area for          Upgraded and extended changeroom,
                          mo.     ta                                                            wt                                                                                                 flora protection
                                    M i                                        Fi Hilla WT al a  a       ;                                                                                         Possible future long term warm             creche, gym and multi-purpose room
                                     i                                                all                                                                                                          water pool, associated plant and           building. Inclusions subject to detailed
                                    mI                                                                                        we                                                                                                              design and likely to comprise retail
                             ‘     Sa                                                                                                                                                              building (short-medium term green          space, compliant changerooms and
                                                                                                                                                                                                   space with cafe tables and umbrellas)      amenities, creche, PW  ensuite, stora
                          Lu Le to Bi                                                                                     1H                                                                                                                                                     Fe
                                   A                             Uh                                                   aS              a                            Pa                              New green space with cafe tables           room, outdoor drying court, additiona
                             1  a                                                                                                                                                                                                             outdoor showers, gym, multi-purpose
                                                             he                       |                                    iy —+++-                                                                and umbrellas                              room for club use, meetings a
                                                                                         A                                                                                                                                                                fer PIP for furt er detat
                                                                                                                      SS                                                                                                                      functions, re
                                                                                                                                                                                                   Proposed new shelter with roll-down
                                                                                                                                                                                                   blinds and bench seating                   Building extension under existing
                                                              “Hil                                             a)      AEE        _                                                                Existing 25m pool                          roof for new manager’s office
                                    wa             *                                  EE                                                                                                           Proposed new spectator shelter with        Reconfigured and renovated
                                                                                                                        ——,  }_) te                                                                                                           administration and cafe building
                                                                                                                                                                                                   bench seating                              to include:
    |                                                                                                                            i                                                                                                            Upgraded entry, reception, offices
                                                                                                                                                                                                   Retain existing maintenance access         (including relocated LTS office), staff
                                                                                                                          we                                                                                                                  amenities, office storage, extended
                                                                                                                               ae Weel                                                             New shade trees                            kitchen, indoor cafe seating and
                              ii                                                                                      |          ee ae                                                             New shade structure over existing          staff lunchroom, refer PIP for
                                                                                                                                                                                                                                              further detail
                                                                                                                                                                                                   grass terraces for 25m pool viewing
                                                                                                                                 na                                                                Proposed new shade structure over          Upgraded water play opportunities in
                                                                                                                             ase                                                                                                              existing LTS and wading
                                                                                                                                                                                                   new  randstand seating at upper site       pool, refer PIP for further detail
                                                                                                                                                                                                       j
                                                                                                                         +   Wu                 —..              m= )                              level or 50m pool viewing, refer PIP       Proposed new filtration system area
                                                                                                                                aS                                                                 for further detai
                                                                                                                             |                                                                     New compliant amenities building and       Retain existing southern car park
                                                                                                                                                                                                   additional outdoor showers to service
                                                                                                                 ae mes          t |  |                              ee ———                        25m   pool at lower site level, and new    Upgrades to entry signage,
                                                                    ae                                a                                                                     fs           ,         lifeguard office with observation decks    landscaping and pedestrian access
                                                                                                                                                                                                   viewing 25m and 50m    pools above at
                                   wl                                           mE   — =                                                               TT)          at        SLUT                      pee! level, refer PIP for further     New bike storage zone including
                                                                                                            Bea hoe]                                                                               50m
                                                                               Pay i       es               ‘yg                     a                                                              detai                                      “bikeep” system or similar
                                                                        Ti      a ee                         a         Emma =                                                                      Retain pump rooms and install new          Upgrades to entry signage and
                                                                                                               hme ees                                                                             storage systems in existing store          landscaping
                                                                      aece      De eS oe SS                                                                                                        rooms for lifeguard use
                                                                      seee.
                          4                                                                        v4                                             Z                                                New DDA compliant ramped access            New bus set down area (bus turn-
                                                                                                                                                                                                                                              around path shown in grey)
                                                                  sanennyl                                                                                                                         to 25m pool area                           Bus passenger waiting zone
                                                                                                                                                                                                   Demolish existing lifeguard building,
                                                                                                                                                                                                   upgrade garden area                        After hours entry point for gym and
                                                                                                                              AR               ‘nae                a                               Consider alternative pool shading          access for multi-purpose room
                                                                                                                                                                                                   options to deliver larger shaded area at
                                                                                                    ca                a                             a         —_—         ae                       southern end of 50m poo
                                                                                                                                               2S                                                  New shade sail structure
                                                                                                                           =
                                                                  Be         at                                                   oe    age              dgsUe 01.08.25 Scale 1:2000@A3
                                                                                                                                                          =a               ESE                                                                              v9 NOOSA
                                                                                                                                                       be
                                           a                                                                 ”                                          *:            12.5         ?   25                                                                   @®&   Council
                                                                                                             ea
                              |                                          ; bem               ~                   -                                                             es
                                                                                           ss

Log in to download the original (Attachment 1 NAC Upgrade Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.