Skip to the record
Beware of cheap imitations.

Original source · versioned page text

NOOSA AQUATICS CENTRE UPGRADE PLAN AND NOOSA AQUATICS FACILITIES STRATEGIC PLAN · Attachment 1 NAC Upgrade Plan

of 8
ee I                  aoe           5
                                                                                                            ASSOCIATED DOCUMENTS
                                                                                                             Ensure all upgrade plan sheets are read in                                        NOOSA AQUATIC CENTRE UPGRADE PLAN
                                                                                                            conjunction with each other, including the                                                                                        SITE PLAN sheet 1 of 7
                                                                                                             prioritised implementation plan (PIP) which
                                                                                                            elaborates on the upgrade plan legend and                                                                                   6 Girraween Ct, Sunshine Beach
                                                                                                             listed improvements

                                                                                                             NOTE
                                                                                               ae           This upgrade plan drawing is conceptual only
                                                                                          Le                 and shall not be used for tendering and/or
‘tT                                                            uy                           EE          ee   construction purposes. A detailed survey of
                                                                   ae |                                      the site has not been undertaken. All works
                                                                                          15 aa   a          are subject to Council approval. Future
                                                                           Pd             a                  architectural and structural engineering
                                             P “se               a                                    -      detailed design shall refine building works
                                                          a*~€                                               Future civil engineering design shall refine car
                                                                                                             park layout
                                                                                                                                        |                                 LEGEND          &      Boundary   =       Biodiversity         Scenic amenity
                                                                                                                                                                                                                    overlay area         buffer area
                                       ALA
                    wir
                                                                             ——    ie ee                                            y
                                                                                                                                                                                                                                    Preservation and protection of 10m scenic
                                                                                                                                                                                                                                    amenity vegetation buffer area
                                                                                                                      Ss)                  /       f \  >.)           ae] Upgraded 25m Pool Hub                                     Preservation and protection of biodiversity
                                                                         ooo                NS |  aes                                   a    ea        ih                                                                           overlay area
                                                                                                        —                                ins     |    4/                         Upgraded 50m Pool Hub                              Existing skate park
                                                                                                                                                        ae                                                                          Retain existing maintenance access
                                                                                           ¥ —     INET A    a                                       i}
                                                                                             —
 eo                                                                                              |   t                                          ie                               Upgraded LTS and Play Hub                          Retain existing southern car park
                                                                                                     we
                                                                                            |    }                                                                                                                                  Reconfigure, seal and inst
                                                                                            —      Pole eee                                                                                                                                                 all shade tree
                                                                    he                      =           a                              ele)                                      Upgraded and extended Changeroom, Creche           planting in eastern car par
                                       aT                                                 f    Ue                                                                                Gym and Multi-Purpose Room Building                Retain maintenance access road
                                     e      1                                                                                                                                                                                       Retain existing path
                                       ih
                                                                                            SN  Paw aareene                                                                      ape ECeS      reconfigured Administ;   ion   o
                                                                                           IN                                                                                                                                       Possible linemarking and portions
                                    ——                                             aN                       6                                                                     IC Cafe B                                         of time restricted parking (3P) along
                               ry EEA                                                                     =                                                                                                                         Girraween Court to maximise car parking
                                                                                                                                                                                                                                    opportunities
                                                                                                                       —
                                                     8                                                 ——
                                                 ——*%
                                       rs                              4                         ;       Pts          —                                                  GENERAL WORKS                                       CAR PARKING
                                                                                                                         |
                                                                                                                     =                                                    e   Critical 50m, and 25m pool filtration           Current
                                                                                                                                                                              system upgrade (including option for pool       e   Approx. 68 formalised (sealed and
                                                                                                                                                                              cooling)                                            linemarked) car parking spaces
                           4                                                 em ST HH PD                 mm    San                               7y                           General cosmetic, landscaping and                   Approx. 55 informal (unsealed) car
                                                                                    —                                                                                         equitable access upgrades across the site           parking spaces
                                                      —
                                          » ant                   woe              ea es tan a a     nn                                                                       including replacement of existing pool          e   6 motorbike/scooter parking spaces
                                                                 ey                Ba   es                                                                                    hoist with one or more contemporary,            Propesee
                                                                 one                od a PP
                                                                 = =               jae a oy PS                                                                                compliant pool hoists
                                                                  ee                                                                                                                                                              Approx. 149 sealed and linemarked car
                                                             aman         age I             ann    waaeue       eee          he      Girraween Ct                             Following completion and monitoring                 parking spaces (including min. 6 PWD
                                                           \ |                                                                   heanwhialet. aad                             of above listed works, investigate the              parking spaces)
                                                                                                                                                                              feasibility and need for the following solar        8 motorbike/scooter parking spaces
                                                                                  | ail                         L                     ~~,                                     energy upgrades                                     1x bus set down area
                                                                           ae             a                                                                                  e   Installation of new panels to                    Secure bike storage zone
                                                              Yu  | aan                 | |                                                                                      replace existing solar panels on the             Electric vehicle charging stations
                                                               an |                                                                                                              Administration and Cafe building                 Formalised and portions of time restricted
                                                                                                                                                                                 Installation of new panels to replace            parking (3P) along Girraween Court
                                                                                                                                     -                                           existing solar panels on Wellness Hub            Coordination of NAC Upgrade Plan with
                                                                                                       YS             €.          oa                                             building                                         current and future active transport
                                                                                                                    IssueK 01.08.25 Scaled 4000 @A3                              Design and construction of shade                 strategies and works
                                                                                                                      bd            Ge                                           structures with solar panels in car park
             al                                                                                                      -   10        25              bol]                          areas
          rs                                                                                                         _                          -                                Installation of solar batteries
            ”
                         =
                                                                                                                          >
                  al

                                                                                                                                                                                                                                                              97 NOOSA
        i:                                                            es |                                        iy              a        a                                                                                                              B® Council

Log in to download the original (Attachment 1 NAC Upgrade Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.