9. Demonstrate that adequate sight lines are available to all proposed pathways,
with consideration given to cyclists who will be travelling at higher speeds than
pedestrians and therefore will require greater sight distances. In this regard the
positioning and alignment of the pathway between Units 10 & 11 (and linking to
the Gateway Drive cul-de-sac) is considered dangerous in a number of different
ways and will need to be reviewed.
10. A 2m wide pathway should be provided around the cul-de-sac frontage of the
development and this should be shown on the amended proposal plans.
11. Illustrate the proposed finished floor levels of the proposed building and car
parking areas on the plans and elevations. Also provide a series of sections
through the site to demonstrate the relationship between the natural landform
and the proposed industrial development.
12. Indicate on the proposal plans the extent of cut/fill earthworks anticipated for the
proposed development (including the extent of any batters and/or retaining walls)
and provide an estimate of the volume of earthworks likely to occur in order to
develop the site as proposed.
13. Illustrate on the proposal plan any retaining walls that may be necessary to
support any fill material placed on site and also indicate the height of these
retaining walls. An indication of the type of retaining walls to be constructed
should also be given.
14. Demonstrate that each industrial unit will be capable of draining all effluent waste
by gravity means to Council’s sewerage reticulation network (i.e. without the need
for pumps).
15. Demonstrate how internal access for maintenance purposes (by the owner and/or
Council) will be given to the southeast corner of the site where at least part of the
development will need to be connected to sewer. In this regard the proposal
does not provide access to this part of the site due to existing developments,
likely future developments, and due to extensive vegetation in this area. To this
end it is noted that the previous approval over the site (23704DA) had proposed
a carparking area in this part of the site and as such access would be more
readily available by the owner and/or Council if needed.
In this regard, an access may need to be provided between Units 29 & 30 or
alternatively have Unit 29 setback sufficiently from the eastern boundary to allow
access past the building and to the south east corner of the site.
16. Illustrate on the proposal plans the location of the electrical substation and the
location of the fire hydrant booster boxes that are likely to be required in order to
serve the proposed development, with consideration given to how maintenance
and/or emergency vehicle access to these services will be obtained.
17. Provide certification from a Registered Professional Engineer Queensland
demonstrating that each industrial unit will be above the estimated 1 in 100 year
Average Recurrence Interval design storm (Q100). In this regard it is likely that
the rear of the site will be subject to flooding from the Noosa River and Lake
Doonella.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 Request for Further Information - 010.2007.00000738.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 28 KB (small file)
- File type
No other editions are linked here.