PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 APRIL 2017
Page 40 of 106
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 APRIL 2017
External:
e Media release
e Baseline knowledge and support surveys (for informing engagement plans and providing post-engagement
effectiveness/success indicators to measure against)
e YSN web page established consultation material to be provided and feedback encouraged.
e Static displays — Noosa Council Chambers, Cooroy Library, Noosaville Library, Mobile Library bus
e Target 2 - 3 high school classes for youth input
e “Climate Café” (World Café-style event for workshopping adaptation options)
e Site tours/field trips with individual stakeholder groups, use of AR a possibility at this point
e Information/fact sheet
e Key stakeholder group briefings (where requested)
e Social Media including Facebook and Instagram
e Surveys and Response form
The specific engagement channels and tools expected to be utilised for each phase of the project are:
Phase 1: Develop life-of-project stakeholder communication and engagement plan (Mar - Apr 2017)
e Media release updating community on commencement of project, with key project details (e.g. scope & schedule)
e Community survey released via dedicated YSN page and announced in media release and on Council Facebook
page
e Report to council updating them on project status and seeking endorsement of PWG and PCG
e Establishment of PCG and PWG
Phase 2: Scoping of coastal hazard issues (Mar - Apr 2017)
e Commission consultant and commence scoping
Phase 3: Identification of areas exposed to current and future coastal hazards (Apr — Jun 2017)
e Presentation of Draft Report to PCG & PWG
e Final Coastal Hazards Assessment Report submitted to Council
e Summary of results posted on YSN informing community
e Static display summarising the need for the project; its aims and scope; and high-level hazard mapping results,
setup at Libraries.
Phase 4: Identification of key assets impacted (May — Jun 2017)
e PWG workshops (one each for biodiversity and one for other assets)
Phase 5: Risk assessment of key assets in coastal hazard areas (Jun — Aug 2017)
e Draft report submitted to PWG, PCG and Council for consideration, and to seek endorsement for field trips and
beginning Phase 6
e Demonstration of draft web-based mapping tool to PCG & PWG
e Update briefing with LGAQ program coordinator and possibly representatives from DEHP
e Media release updating community of project and post update to YSN
e Field trips/meetings with key external stakeholder groups (business, homeowners, environmental and
infrastructure/utilities) to outline summary findings of Phases 2-5 and seek their input on community values.
Phase 6: Identification of potential adaptation options (Aug — Sept 2017)
e Present draft adaptation options report to PWG, PCG and Council
Phase 7: Socio-economic appraisal of adaptation options (Oct — Nov 2017)
e PWG and PCG workshop
e Presentation of final reports to key internal stakeholders, PWG, PCG and LGAQ.
Phase 8: Final adaptation plan and implementation planning (Jan — Oct 2018)
e Submission of final report to Council, and presentation of project summary, progress and achievements to date, and
next steps.
Page 40 of 106See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.