Skip to the record
Accept no imitations.

Council archive · source document

09/0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published] · 142009.982

of 48

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

EASEMENTS AND SUBSTATIONS

4.1.3. |Is aniy of the proposed operational work for filling or excavation?
No-Gotoas14  []Yes

I yes, is the filling or excavation associated with reconfiguring a lot?

 

Yes No - Answer both (a) and (b) below
(a) Is any part of the premises Subject to an easement in favour of a distribution entity or transmission entity
under the Electricity Act 1994? :
[] No Yes

If yes, is any of the operational work proposed to be iocated in any part of the easement?
CI No L_] Yes - This application must be referred to the entity as Advice Agency.

(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act
1994?
IN) LJ Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
JP Regulation, sefedila 2, lable 2dem ta} iP Rew

 

spheduuie 2, table 2, tem 10th}
4.1.4 |\s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued-under the Petroleum
‘ Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
LINo-Gotoas15 LC] Yes

If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with e
reconfiguring a lot?

 

CINo OyYes
If yes, is any of the operational work proposed to be located in any part of the easement?
No O YeS - This application must be referred to the licence holder as Advice Agency,

iP Regukiion, schedule 2. tabla 3, tem 17.
PUBLIC PASSENGER TRANSPORT : >
415 ils any, of the proposed operational work fisted in schedule 13C of the ° Integrated Planning Regulation 18 1998 and 1 does it exceed the

 

 

specified threshold? a we

No - Go to Q4.1.6 Ol Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
schedule 2. table 3. item 14
RAILWAY SAFETY AND EFFICIENCY
4.1.6 | Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold? :
vA No - Go to. 04.1.7 oO YeS - This application must be referred fo Queensland Transport (Q7) as Concurrence Agency.

ip

ip

 

 

 

    

th

 

KOALA CONSERVATION (outside SEQ urban footprint)

4.1.7 |\s afly part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area? ° e@
No - Goto 04.2 O Yes

if yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation the. e, did you answer ‘yes’ fo all questions in either Q2. 1.8.0F Q 3. 12}?
CYes-Gotoosz2 [No

 

Iino, is the proposed operationa! work for a domestic activity, as defined by the Environmental Protection Act 1994?
C1 Yes-cotoas2 [INo

If no, will the activity result in the following?

 

 

 

 

. _ (i} Clearing of native vegetation over an area greater than 2,500m2 (LINo fl Yes |
(ii) Extracting gravel, rock or sand from an area greater than 5,000? i Lino !( Yes
{iil) Excavating or filling an area greater than 5,000m2 {Ne {Fes

 

 

 

Hf yes to one or more of (i) — (ili} above - This application must be referred to the Environmental Protection Agency {EPA} as
Concurrence Agency.

1 schadule 2 lalte 2. dem 19.

 

 

 

 

WILD RIVER AREA - although legislation provices for assessment of operational wor

for residential, commercial and industria! development for the purposes ot the
Wild Rivers Aci 2005, currenlly no declarations for any of the wild river areas apply the Wi

Fs Code lo that type of development.

   

 

 

 

Page 28

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0982 - Op Works - Prescribed Tidal Works - Extensions to Jetty [As Published].pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.