Attached to the e-mail SECOND PM Submission - Eric Ruben - 51983.3225.14.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

AA RR RALit IA aie

Construction works of any kind are only to be carried out during M i

Medann ly 9 Monday to Friday between the hours of 8
7 No jackhammerin: i i

9 OF Noisy construction works of any kind are to be undertaken before 1

Nontay ts Nich ore y en before 10 am or after 3 pm
8, Where Possible dust screens are to be installed or other suitable dust extraction system used to prevent dust

travelling to and through other units and common property,
9 eureart must use their best endeavours to minimise all noise during construction including but not limited

Not allowing foul language or allowing any music to be heard outside the lot and not to intrude on the

privacy of other guests within the complex.

10.

Lot owner or principal contractor must liaise with management and provide management with a schedule of
Proposed works including expected start and c

‘ompletion dates.

11. Any Cleaning of common property required as a result of the works must be done at the end of each day to
the satisfaction of management.

12. All equipment is to be stored out of sight at the end of each working day and is not to be left or stored on

common property. It must be contained within the lot boundaries of the lot.

13. No Parking is permitted on site unless within the boundaries of the lot only.

14. No use of the body corporate driveway is permitted for deliveries of materials unless approved by
Management prior to the delivery.

15.

Any damage caused to common Property as a result of the works is the responsibility of the lot owner to
€nsure rectification to the satisfaction of the body corporate.

21.4 In addition to any conditions the Bod

ly Corporate imposes pursuant to by-law 22.3, 21.3 the following
conditions also apply:

Minimising disturbance to other occupiers

(a) the Building Work is permitted to be carried out from 1 February to 15 December and between the hours of
8.00 am and 4.00 pm Monday to Friday. Work is not permitted on public holidays or during Queensland
school holidays unless prior written agreement has been obtained from management.

(b) the Owner must ensure its contractors comply with the following obligations:

(i) compliance with the by-laws — all contractors are bound by and must observe all of the by-laws for the
Scheme when on Scheme land;

(ii) parking and access requirements -contractors’ vehicles must not be parked on Common Property
without the prior written consent of the Body Corporate or in agreement with the Manager.

(iii) equipment — no equipment may be stored or left on Common Property without the prior written consent of
the Body Corporate; or in agreement with the Manager.

(iv) _ waste - all waste must be removed from the Lot or stored out of sight at the end of each day. No waste
may be deposited in the Common Property waste disposal bins or on any other part of the Common
Property. The Owner must arrange for all waste to be disposed of offsite;

(v) hosing — no hosing of any material onto Common Property including gardens and drains;

(vi) damage — the Owner must arrange for the repair of any damage to or destruction of any part of the Scheme
Land caused by or incidental to the Building Work.

(c) the Owner must use all reasonable efforts to minimise noise, including but not limited to the closing of all
windows and doors within the Lot;

(d) the Owner must give at least 24 hours’ notice to the Manager of any work that may create a noise
disturbance to other Occupiers;

(e) at the completion of the Building Work, if dust, dirt, debris or other waste has impacted any other Lots or

Common Property as a consequence of the Building Work, the Owner must arrange for a wash-down of those
Lots or Common Property;

THE HASTINGS CTS 21433 Page 3

Scanned with CamScanner
Log in to download the original file

AGM EGM Motion Results.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.