Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published) · MCU24/0125
ii. Ensure clean stormwater is diverted/managed around or through the site
without increasing the concentration of total suspended solids or other
contaminants in the flow and without causing erosion (on-site or off-site). If it is
not feasible to divert all areas discharging clean stormwater around or through
the site, the clean stormwater runoff is managed in the same manner as
contaminated stormwater runoff and ensures that sediment basins are sized to
accommodate the additional volume of runoff.
iii. Prior to each rainfall event ensure concentrated stormwater flow paths are
provided with capacity in accordance with IECA (2008) Table 4.3.1 and do not
cause water contamination, rill or gully erosion, sedimentation or damage to
structures or property.
c. Minimise sediment released from the site:
i. All site sub-catchments greater than 2,500m2 in area, are to be provided with
sediment controls which are designed, implemented and maintained to a
standard which would achieve at least 80% of the average annual runoff volume
of the contributing catchment treated (i.e. 80% hydrological effectiveness) to
50mg/L Total Suspended Solids (TSS) or less, and pH in the range 6.5–8.5.
Where this is proposed to be achieved through the use of sediment basins, the
following applies:
A. each basin is sized and operated in accordance with either a Type-A or
Type-B sediment basin as documented in IECA (2008) Appendix B (June
2018) unless otherwise justified, based on the contributing catchment area
including undisturbed catchments which cannot be diverted;
B. each Type-A or Type-B sediment basin is to be provided with an automated
system of flocculant dosing and a suitable supply of flocculant/coagulant,
with the type of flocculant/coagulant determined based on Chemical
Coagulants and Flocculants Fact Sheet (IECA, 2018);
C. markers are provided within each basin indicating the maximum sediment
storage level and any additional water storage capacity for water reuse;
D. during discharge from the primary outlet system, the concentration of total
suspended solids (TSS) discharged does not exceed 50mg/L and that pH
is within the range of 6.5-8.54. These discharge standards apply equally to
any intentional release of any water captured or stored within the site;
E. The hydraulic structures such as inlets, outlets, spillways must be
structurally sound for the design events as specified in IECA (2008); and
F. The sediment basin is to be constructed and operational before any
disturbance occurs in the catchment upslope of the basin. Accumulated
sediment from basins and other controls is to be removed and disposed of
appropriately without causing water contamination.
ii. For site sub-catchments less than 2,500m2 in area and where it is not feasible
to divert runoff from these small disturbed areas of the site to a sediment basin,
compensatory erosion and sediment controls are implemented prior to rainfall
to ensure that erosion of those of areas is minimised and Type 2 or Type 3
sediment controls are provided in accordance with IECA (2008).
iii. Controls are to be installed to minimise the tracking of dirt from the site onto
roadways. Any dirt on roadways caused by vehicles leaving the site is to be
removed without causing water contamination, prior to rainfall and at least at
the end of each work day.
d. Manage works within waterways:
Page 32 of 39
Document Set ID: 23843933
Version: 14, Version Date: 05/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0125, OPW24 0150 & RAL24 0021 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.