Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2015-10-22 Ordinary Meeting Agenda

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                        22 OCTOBER 2015


2.   Tender Assessment

The tender evaluation panel carried out an assessment of the seven conforming tender
submissions from:

1)   Allens Asphalt;
2)   Allroad Surfaces;
3)   Australian Paving Services;
4)   Downer EDI;
5)   RPQ Spray Seals;
6)   Tropic Asphalt; and
7)   Road Surfaces Group.

The following table shows which portions of the contract each contractor quoted for:

                                             Portion   Portion   Portion   Portion
               Contractor
                                             A         B         C         D
               Allens Asphalt                                        
               Allroad Surfaces                                      
               Australian Paving Services                            
               Downer EDI                                            
               RPQ Spray Seals               X         X                 
               Tropic Asphalt                                        
               Road Surfaces Group           X         X                 X

               Tendered                      
               Not Tendered                  X


The tenders were then evaluated using the following criteria:

    Capability and Resourcing
    Track Record
    Methodology
    Quality
    Safety
    Environment Sustainability
    Contribution to Local Economy
    Price

The evaluation methodology considered non-price elements (70% of the score) and a price
component (30% of the score).

3.   Portion A – Road Resurfacing and Rehabilitation Programme

Portion A is the main component of Council’s Road Resurfacing programme. This portion is
associated with asphalt resurfacing. The majority of these projects are high order roads that are
severely cracked and require the existing surface to be removed and then replaced at the same
level.

Five conforming tenders were evaluated for Portion A of the contract, Allens Asphalt, Allroad
Surfaces, Australian Paving Services, Downer EDI and Tropic Asphalt.



                                                                                     Page 13 of 20
Log in to download the original file

2015-10-22 Ordinary Meeting Agenda(PDF, 2MB).pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.