Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Decision Notice - Approved by Delegation of Authority - MCU25 0054 & OPW25 0077 (As Published) · MCU25/0054

of 21

Text shows just the words. Original shows the document exactly as it was published.

               15.    All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.
               16.    Waste storage areas, clothes drying areas and external storage areas must be screened
                      from view of the street.
                      Fencing and Walls
               17.    Any street fencing must not exceed 1.8 metres in height, be set back an average of 1 metre
                      and articulated to provide visual interest by stepping the design. Any fencing on the front
                      boundary must either:
                      a.      not exceed a maximum height of 1.2 metres
                      b.      be of open construction.
               18.    The area of land between the fence and the front property boundary must be densely
                      landscaped to screen any fencing from the street as indicated on the approved plans.
                      Protection of Privacy
               19.    The external spiral staircase located on the rear third storey projection of Unit 2 must include
                      either balustrading or fixed external screens, positioned in such a way to obscure direct views
                      into the private open space areas of the adjoining property to the rear. Any screening
                      measures must be a minimum height or 1.7 metres above floor/stair level.
                      Site Access and Driveways
               20.    A sealed access driveway must be provided from William Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      the conditions of this approval, be generally in accordance with SCG Consulting’s
                      Operational Works Driveway & Access Plan (00461-OW4.1) and Operational Works
                      Driveway Details (00461-OW4.2) dated April 2025 and must include in particular:
                      a.      A driveway crossover in accordance with Council standard drawings RS-049 and RS-
                              050 and any associated addendum.
                      Car Parking
               21.    A minimum of 6 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      1 visitor parking spaces within the total, which are clearly marked for that purpose and
                              accessible at all times for visitor use;
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
                      Stormwater Drainage
               22.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with the conditions of this approval
                      and be generally in accordance with SCG Consulting’s Operational Works Stormwater
                      Management Plan Basement Level (00461-SW1.1) and Operational Works Stormwater
                      Management Plan Ground Level (00461-SW1.2) dated April 2025.
                      Services
               23.    Reticulated electricity and telecommunication services must be provided to each lot/unit in
                      accordance with an approval for Operational Works and the standards and requirements of
                      the relevant service provider.
               24.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.




                                                                                                        Page 4 of 21
Document Set ID: 24087855
Version: 5, Version Date: 03/09/2025

Used in these records

About this file

File size
211 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority - MCU25 0054 & OPW25 0077 (As Published).pdf · 211 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.