Attachment C -Substation Options

Attached to the e-mail Operational Works Application OPW19/0157 - Cover Letter - DA Form 1 - Sub Station Detail Sheet 1, 2 & 3 -Montage existing - Montage Proposed - Consultant Advice Notice - Tree Management Plan - The Esplanade Sunshine Beach.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Site Details
Following a review of the available connection points for high voltage, it was determined that a new service
connection along Webb St was the most practical.




Below is a street view photo of the proposed transformer location.




A review of the available information of the site has indicated the following:
    •   Access to the site is reasonable for construction equipment
    •   Any inground works, including footings, conduits etc, will impact the existing trees
    •   The existing overhead network will need to be reviewed and adjusted to suit the proposed works.
    •   The site is generally sloping from Webb St toward the park and the surf club.




                                                                                                       Page 3 of 6
Log in to download the original file

Attachment C -Substation Options.pdf · 976 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.