MCU15.0034 Negotiated Decision Notice
Attached to the e-mail MCU15/0034 - Height Certification.
MCU15/0034
4 ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
4GYM-51-32- 02 Site Specific Notes and Antenna Table drawn by 23/04/2015
SCHR-C1 Aurecon
4GYM-51-32- 02 Overall Site Plan drawn by Aurecon 23/04/2015
SCHR-C2
4GYM-51-32- 03 Site Setout Plan drawn by Aurecon 05/05/2015
SCHR-C3
4GYM-51-32- 03 Site Elevation and Details drawn by Aurecon 05/05/2015
SCHR-C2
LP1.01 B Landscape Plan drawn by Jeremy Ferrier 18/08/2015
Landscape Architect
LP1.02 B Landscape Specification Notes & Details drawn by 18/08/2015
Jeremy Ferrier Landscape Architect
LP1.03 B Tree Retention Plan drawn by Jeremy Ferrier 18/08/2015
Landscape Architect
3. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed within this Decision Notice.
Building Height
4. The maximum height of the structure must not exceed 41 metres above the finished
ground level and the natural ground surface.
5. Certification must be submitted to Council from a Licensed Surveyor which certifies that
the monopole structure does not exceed the maximum height requirement of this
Decision Notice.
6. No lights are permitted to be attached to the telecommunications facility, except where
required for aircraft hazard lighting purposes or similar.
Health and Safety
7. The development must not, at any time during the life of the development, result in
human exposure to environmental electromagnetic emissions exceeding the current
regulations, standards and/or recommendations of the Australian Radiation Protection
and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure must provide,
at any time upon request by Council, written certification to demonstrate compliance with
this condition. The written certification must assume:
Page 2 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.