Original source · versioned page text
MCU15.0034 Negotiated Decision Notice
Attached to the e-mail MCU15/0034 - Height Certification.
MCU15/0034 Aurecon Group for NBN Co 2 L12 on RP883248 ADVICE AGENCY’S RESPONSE Sections 291 and 292 of the Sustainable Planning Act 2009 RESPONSE TO DEVELOPMENT APPLICATION Powerlink Queensland, acting as an advice agency under the Sustainable Planning Act 2009 provides its response to the above application. The advice agency's response is that: XK this application should be approved subject to the following conditions: 1. Compliance with the terms and conditions of easement dealing no. 601108825. 2. Any variation to the proposed layout as shown on the enclosed copy of the submitted Drawing “Overall Site Plan” 4GYM-51-32-SCHR-C2 Rev 02 dated 23/04/2015 shall require resubmission. 3. This advice is valid for a period of 2 years from the date of this response, should the development not be initiated within that period, the applicant should resubmit the application for re-consideration. 4. This response does not constitute an approval to commence any works within the transmission line corridor. While Powerlink Queensland has no ‘in principle’ objection to the proposed MCU, any works on easement would require detailed final design submissions, assessments and approvals (or otherwise) by Powerlink Queensland. We would prefer this information to be submitted in electronic format 3D DXF of final design RL's AHD and MGA GDA94 in applicable zone. In addition, the following requirements should be considered in your Operational Works application for proposed on-easement work. 5. Compliance with the generic requirements in respect to proposed works in the vicinity of Powerlink Queensland infrastructure as detailed in the enclosed Annexure =A", 8. Compliance with the Electrical Safety Act 2002 (‘the Act’) including any Code of Practice under the Act and the Electrical Safety Regulation 2013 (“the Regulation’) including any safety exclusion zones defined In the Regulation. In respect to this application the exclusion zone for untrained persons and for operating plant operated by untrained persons is six (6) metres from the 275,000- volt wires and exposed electrical parts. Should any doubt exist in maintaining the prescribed clearance to the conductors and electrical infrastructure, then the applicant is obliged under the Act to seek advice from Powerlink Queensland. Page 7 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.