Original source · versioned page text
MCU15.0034 Negotiated Decision Notice
Attached to the e-mail MCU15/0034 - Height Certification.
MCU15/0034 Aurecon Group for NBN Co 3 L12 on RP883248 7. In order for Powerlink Queensland to maintain and operate a safe and reliable supply of electricity, we require unrestricted 24-hour access to our infrastructure. Typically such access must be suitable for a 4WD vehicle but to a standard no less than existing, and the need for access by a 100-tonne crane must also be considered. If it is envisaged that there will be any interference to our current access arrangements; we require that the applicant contacts our Maintenance Service Provider: Richard Beames ph (07) 3860 2111 to formalise unrestricted 24-hour access arrangements for Powerlink Queensland. Enciosures:- ~ Annexure “A” 2 Overall Site Plan® 4GYM-51-32-SCHR-C2 Rev 02 dated 23/04/2015 Page 8 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.