MCU15.0034 Negotiated Decision Notice

Attached to the e-mail MCU15/0034 - Height Certification.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

MCU15/0034

 

Aurecon Group for NBN Co 3 L12 on RP883248

7. In order for Powerlink Queensland to maintain and operate a safe and reliable
supply of electricity, we require unrestricted 24-hour access to our infrastructure.

Typically such access must be suitable for a 4WD vehicle but to a standard no less
than existing, and the need for access by a 100-tonne crane must also be
considered.

If it is envisaged that there will be any interference to our current access
arrangements; we require that the applicant contacts our Maintenance Service
Provider: Richard Beames ph (07) 3860 2111 to formalise unrestricted 24-hour
access arrangements for Powerlink Queensland.

Enciosures:- ~ Annexure “A”
2 Overall Site Plan® 4GYM-51-32-SCHR-C2 Rev 02 dated 23/04/2015

Page 8 of 15
Log in to download the original file

MCU15.0034 Negotiated Decision Notice.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.