SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2003.00221172.002 [As Published] · 132003.221172.2
2003/221172
Vegetation Protection
24. Existing trees to be retained shall be protected during the construction phase by providing
temporary fencing around the trees. Plans submitted for Operational Works approval shall
clearly show this.
Roadworks Contributions
25. A roadworks contribution of $1,061 towards the Coastal Major Road Network shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount will
be subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date
of payment.
Roadworks Widening
26. The Elanda Street frontage of the development shall be provided with kerb & channelling and
bitumen road widening. The new kerb & channel shall be aligned so that it is located 8 metres
off the existing kerb & channel on the western side of the road measured from the nominal
face of the kerb.
All associated and ancillary work including pavement correction to the existing pavement,
drainage works, modification of the footpath, and adjustments to any existing infrastructure
shall be undertaken to complete the roadworks widening.
Plans detailing this work shall be prepared and submitted to Council for approval prior to
obtaining a Development Permit for Operational Works.
Frontage Works
27. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
28. A new 1.2 metre wide concrete path shall be constructed along the frontage of the site in
accordance with Council’s design standards and to an alignment that protects any significant
vegetation or any underground services. The path shall be designed and constructed to
ensure pedestrian safety using non-slip materials and to produce an evenly graded surface
finish.
Pathway Contributions
29. A pathway contribution of $246 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from June 2004 until the date of payment.
Stormwater Drainage
30. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site. Plans of the drainage design shall be prepared by a
Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
Any stormwater discharged to Council’s street drainage system shall have a maximum
discharge at any one location of 25 litres/second.
31. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
32. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2003.00221172.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.