Council archive · source document
JFP SBSMP Revision C · OPW24/0103
The XP-STORM peak flows are generally similar to the Rational Method Calculation, particularly for the
larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow rates have been used for the peak
flow and detention tank analysis for this site.
Table 6 presents the pre-development peak flows with a 20% increase in rainfall intensities for the year
2100.
Table 6 – Pre-Development Peak Flows (2100 Rainfall Intensities)
Pre-Development Peak Flows (m³/s)
2100 Rainfall Intensities
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
XP-STORM 0.016 0.021 0.027 0.034 0.040 0.042 0.046
3.5 POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA
Table 7 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in Appendix
D presents the catchment delineation.
Table 7 – Post-Development Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
D1 0.0335 100% 10%
D2 0.0121 66% 10%
D3 0.0030 100% 10%
Total 0.0486 92% 10%
The following catchment arrangements have been modelled:
5% AEP from catchment D1 has been modelled to enter the detention tank. Larger flows bypass
detention.
1% AEP from catchment D2 has been modelled to enter the detention tank.
Catchment D3 bypasses the detention tank.
Figure 5 presents the XP-STORM layout for the post-development site.
Figure 5 – Post-Development XP-STORM Layout
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.