The XP-STORM peak flows are generally similar to the Rational Method Calculation, particularly for the
larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow rates have been used for the peak
flow and detention tank analysis for this site.

Table 6 presents the pre-development peak flows with a 20% increase in rainfall intensities for the year
2100.

                          Table 6 – Pre-Development Peak Flows (2100 Rainfall Intensities)
                                                Pre-Development Peak Flows (m³/s)
                                                     2100 Rainfall Intensities
                     63% AEP        39% AEP      20% AEP    10% AEP        5% AEP            2% AEP       1% AEP
    XP-STORM           0.016         0.021           0.027         0.034        0.040         0.042        0.046



3.5      POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA

Table 7 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in Appendix
D presents the catchment delineation.

                                   Table 7 – Post-Development Catchment Data
                                                                    Fraction            Vectored Slope
                 Catchment                Area (ha)
                                                                   Impervious                (%)
                     D1                    0.0335                    100%                    10%
                     D2                    0.0121                     66%                    10%
                     D3                    0.0030                    100%                    10%
                    Total                  0.0486                     92%                    10%

The following catchment arrangements have been modelled:
     5% AEP from catchment D1 has been modelled to enter the detention tank. Larger flows bypass
      detention.
     1% AEP from catchment D2 has been modelled to enter the detention tank.
     Catchment D3 bypasses the detention tank.

Figure 5 presents the XP-STORM layout for the post-development site.




                                  Figure 5 – Post-Development XP-STORM Layout




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e |9

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

JFP SBSMP Revision C.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.