3.5.2 RAINFALL DATA
As per the pre-development scenario and includes the 20% increase in rainfall intensities.
3.5.3 HYDROLOGICAL LOSSES & BX FACTOR
As per the pre-development scenario.
3.5.4 DETENTION TANK
Table 8 presents the detention tank parameters modelled. Refer to Appendix C for the stage vs area
relationship. Re-analysis will be required if the stage-area relationship is significantly altered.
Table 8 – Detention Tank Details
Detention Parameter Value
Surface Area (m²) 8.5
Volume (m³) 20.4
Depth (m) 2.4
Tank IL (m AHD) 30.1
Orifice Outlet 80mm dia at IL 30.1m AHD
Weir Outlet 1500mm weir at RL 32.43m AHD
3.5.5 POST-DEVELOPMENT PEAK DISCHARGE
The XP-STORM was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard durations. Table
9 and Table 10 present the peak flow results.
Table 9 – Pre & Post-Development Peak Flows (XP-STORM)
Peak Flow Results (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Post-Dev.
(2100 rainfall 0.011 0.014 0.016 0.018 0.020 0.022 0.024
intensities)
Pre-Dev.
(2100 rainfall 0.016 0.021 0.027 0.034 0.040 0.042 0.046
intensities)
Variance -0.004 -0.008 -0.011 -0.015 -0.020 -0.020 -0.021
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.