This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.0 PROPOSED DEVELOPMENT The proposed development consists of an industrial complex comprising 11 industrial units, concrete parking area and landscaping. The proposed development will comprise the construction and/or installation of the following components for land use purposes: site earthworks and buildings access driveway and car parks stormwater drains other ancillary services landscaping. Once the development has been completed, all disturbed portions of the site will be rehabilitated or covered by some form of protection against soil erosion and the transportation of suspended solids from the site. These improvements will include structures, paved areas, and landscaping. Site Based Stormwater Management Plan Page 3 of 19 2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.