and
d) the protection of any foreshores near
the work and the vegetation and marine
plants on the foreshores.
Design, construction and safety—all prescribed tidal work
12.1 Prescribed tidal work is designed The design and construction of the Complies – the prescribed tidal works
and constructed in a way to ensure it is prescribed tidal work is consistent with have been designed with regard to all
structurally sound, having regard to the the following standards— appropriate Australian Standards. Please
following— refer to the attached Proposal Plan
(a) subject to paragraph (b), each prepared by International Marina
a) relevant engineering standards; Australian Standard relevant to Consultants.
the design or construction of
b) the location of the work; structures, to the extent
requirements stated in the
c) the purpose for which the work is to Standard apply to the design or
be used; construction of prescribed tidal
work;
d) the impact of flooding, tidal
influences and hydrodynamic changes. (b) if a relevant planning scheme
standard is more stringent than
any standard mentioned in
paragraph (a) —the relevant
planning scheme standard, to
the extent it is more stringent
than the standard mentioned in
paragraph (a).
12.2 Prescribed tidal work does not The design and construction of the Complies – The proposed tidal work
adversely affect the structural integrity prescribed tidal work is consistent with has been designed by an REPQ so as to
of any existing revetment or seawall or the following standards— ensure the structural integrity of the
another existing structure. proposed works and the existing marina.
(a) subject to paragraph (b), Please refer to the attached Proposal
prescribed tidal work, including Plan prepared by International Marina
any shore abutment, piling or Consultants.
other structure connected with
the work—
i) does not place an
additional load on any
existing revetment or
seawall or another
existing structure; or
ii) can be structurally
supported by an existing
revetment or seawall or
another existing
structure;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) —the relevant
planning scheme standard, to
the extent it is more stringent
than the standard mentioned in
paragraph (a).
12.3 Prescribed tidal work is designed The design and construction of the Complies – the prescribed tidal works
and constructed in a way to ensure it prescribed tidal work is consistent with will not alter or disturb the existing flow
does not adversely affect the stability of the following standards— of water, or adversely affect the stability
the bed and banks of any tidal water. of the riverbed and banks. Please refer
(a) subject to paragraph (b), to the attached Proposal Plan prepared
prescribed tidal work does not by International Marina Consultants.
cause, by changing the flow of
water, the removal of, or
disturbance to, the sediment on
the bed and banks of any tidal
water;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a)—the relevant
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.