and

d) the protection of any foreshores near
the work and the vegetation and marine
plants on the foreshores.
Design, construction and safety—all prescribed tidal work
12.1 Prescribed tidal work is designed The design and construction of the                Complies – the prescribed tidal works
and constructed in a way to ensure it is prescribed tidal work is consistent with        have been designed with regard to all
structurally sound, having regard to the the following standards—                        appropriate Australian Standards. Please
following—                                                                               refer to the attached Proposal Plan
                                           (a)    subject to paragraph (b), each         prepared by International Marina
a) relevant engineering standards;                Australian Standard relevant to        Consultants.
                                                  the design or construction of
b) the location of the work;                      structures,     to    the    extent
                                                  requirements stated in the
c) the purpose for which the work is to           Standard apply to the design or
be used;                                          construction of prescribed tidal
                                                  work;
d) the impact of flooding, tidal
influences and hydrodynamic changes.       (b) if a relevant planning scheme
                                                  standard is more stringent than
                                                  any standard mentioned in
                                                  paragraph (a) —the relevant
                                                  planning scheme standard, to
                                                  the extent it is more stringent
                                                  than the standard mentioned in
                                                  paragraph (a).
12.2 Prescribed tidal work does not The design and construction of the                   Complies – The proposed tidal work
adversely affect the structural integrity prescribed tidal work is consistent with       has been designed by an REPQ so as to
of any existing revetment or seawall or the following standards—                         ensure the structural integrity of the
another existing structure.                                                              proposed works and the existing marina.
                                           (a)    subject to paragraph (b),              Please refer to the attached Proposal
                                                  prescribed tidal work, including       Plan prepared by International Marina
                                                  any shore abutment, piling or          Consultants.
                                                  other structure connected with
                                                  the work—
                                                    i)     does not place an
                                                           additional load on any
                                                           existing revetment or
                                                           seawall     or     another
                                                           existing structure; or
                                                    ii)    can     be     structurally
                                                           supported by an existing
                                                           revetment or seawall or
                                                           another            existing
                                                           structure;

                                              (b)     if a relevant planning scheme
                                                      standard is more stringent than
                                                      the standard mentioned in
                                                      paragraph (a) —the relevant
                                                      planning scheme standard, to
                                                      the extent it is more stringent
                                                      than the standard mentioned in
                                                      paragraph (a).
12.3 Prescribed tidal work is designed       The design and construction of the          Complies – the prescribed tidal works
and constructed in a way to ensure it        prescribed tidal work is consistent with    will not alter or disturb the existing flow
does not adversely affect the stability of   the following standards—                    of water, or adversely affect the stability
the bed and banks of any tidal water.                                                    of the riverbed and banks. Please refer
                                              (a)   subject to paragraph (b),            to the attached Proposal Plan prepared
                                                    prescribed tidal work does not       by International Marina Consultants.
                                                    cause, by changing the flow of
                                                    water, the removal of, or
                                                    disturbance to, the sediment on
                                                    the bed and banks of any tidal
                                                    water;

                                              (b)   if a relevant planning scheme
                                                    standard is more stringent than
                                                    the standard mentioned in
                                                    paragraph (a)—the relevant

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Assessment Report.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.