Prelim Construction Management Plan[1]
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable of Contents
1. Important Note 2
2. Introduction 3
2.1 Purpose 3
2.2 Scope of this Plan 3
2.3 Proposed Works 3
2.4 Site Location 4
2.5 Contact Details 4
3. Construction Management 5
3.1 Approach 5
3.2 Approvals 5
3.3 Site Security 5
3.4 Public / Worker Safety 6
3.5 Traffic Management Plan 6
3.6 Worker Carparking 6
3.7 Communications Protocol / Complaints Procedure 6
3.8 Existing Infrastructure 7
3.9 Fencing 7
4. Construction Methodology 8
4.1 Demolition and Excavation 8
4.2 Construction Sequence and Planning 8
4.3 Rubbish Removal 8
5. Environmental 9
5.1 General 9
5.2 Noise and Vibration Management 9
5.3 Air Quality / Dust Management 9
5.4 Stormwater and Sediment Control 10
List of Figures
Figure 1: Site Location Map ...................................................................................................................................... 4
List of Attachments
Attachment A - Traffic Guidance Scheme prepared by Evolution Traffic Management
RG Strategic Preliminary Construction Management Plan 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.