Prelim Construction Management Plan[1]
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn1. Important Note
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted
under the Copyright Act, no part of this report, its attachments or appendices may be reproduced
by any process without the written consent of RG Strategic. All enquiries should be directed to RG
Strategic.
We have prepared this Preliminary Construction Management Plan for Glen Grams (“Client”). This
report is strictly limited to the purpose and the facts and matters stated in it and does not apply
directly or indirectly and will not be used for any other application, purpose, use or matter.
In preparing this report we have made certain assumptions. We have assumed that all information
and documents provided to us by the Client or as a result of a specific request or enquiry were
complete, accurate and up-to-date. Where we have obtained information from a government
register or database, we have assumed that the information is accurate. Where an assumption has
been made, we have not made any independent investigations with respect to the matters the
subject of that assumption. We are not aware of any reason why any of the assumptions are
incorrect.
This report is presented without the assumption of a duty of care to any other person (other than
the Client) (“Third Party”). The report may not contain sufficient information for the purposes of a
Third Party or for other uses. Without the prior written consent of RG Strategic;
• this report may not be relied on by a Third Party; and
• RG Strategic will not be liable to a Third Party for any loss, damage, liability or claim arising
out of or incidental to a Third Party; and
• publishing, using or relying on the facts, content, opinions or subject matter contained in
this report
If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report
with or without the consent of RG Strategic, RG Strategic disclaims all risk and the Third Party
assumes all risk and releases and indemnifies and agrees to keep indemnified RG Strategic from any
loss, damage, claim or liability arising directly or indirectly from the use of or reliance on this report.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of
profits, damage to property, injury to any person (including death) costs and expenses incurred in
taking measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs,
compensation, interest and any other direct, indirect, consequential or financial or other loss.
RG Strategic Preliminary Construction Management Plan 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.