Prelim Construction Management Plan[1]
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2. Introduction 2.1 Purpose This Preliminary Construction Management Plan has been prepared to describe how the Project Management team shall implement and conduct its allocated site management responsibilities during the Operational Works phase of the “Lot Subdivision” (the Project). A fundamental aim of this Plan is to ensure all construction is properly facilitated, integrated, and coordinated to deliver certainty to the objectives of the Project. The preparation of a Preliminary Construction Management Plan was conditioned (Condition 26) by Noosa Council as part of the higher order approval RAL21/0028 dated 30 March 2022. 2.2 Scope of this Plan This Plan provides a holistic approach that: • advises how the project management team will comply with the requirements of the contract relating to construction; • defines the project objectives and targets of particular relevance to the construction phase; • describes constraints specific to the construction phase and the project in general; • describes the process for the identification and control of risks specific to the construction phase; and • details the proposed strategy for the construction phase, with particular regard to establishment resourcing, site organisation and construction controls. 2.3 Proposed Works The proposed works require the construction of: • a 2.0 metre wide pedestrian footpath within the road verge for the entire length of the site’s frontage to Rene Street • kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed • a driveway located generally in accordance with drawing number 03-1159-C1 Sheet 1 Revision A prepared by Lindsay Consulting dated 11 February 2022 • a driveway crossover in generally in accordance with Council’s Standard Drawing No RS- 051 and any associated addendum • landscaping generally in accordance with Council’s Decision Notice (RAL21/0028). RG Strategic Preliminary Construction Management Plan 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.