Prelim Construction Management Plan[1]
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThis type of construction will have several distinct phases that will require different material handling
strategies to optimise the construction works and minimise impact to surrounding streets, other
stakeholders and neighbours. Our material handling strategies and construction planning will be
consulted with stakeholders and authorities before implementation.
2.4 Site Location
The proposed development site (refer Figure 1) has direct access from Rene Street.
Subject Site
Belmondos
Figure 1: Site Location Map
Source: Near Map
2.5 Contact Details
For all on-site operational and construction matters, refer to the below contact details:
Principal Site Contractor: to be appointed.
Project Manager: to be appointed.
RG Strategic Preliminary Construction Management Plan 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.